ROADS AND BRIDGES
£45,000 NEEDED FOR REPAIRS By Telegraph Press association HASTINGS. May 31. Approximately £45,000 will need to be spent in restoring damaged bridges and clearing slips from roads in the Hawke’s Bay county as a result of the floods. This figure' does not allow for the cost of metal for the roads once they have been cleared. The cost of repairs is estimated by the county engineer, Mr R. Pulfiett, to be divided into about £20,000 for the restoration of bridges and more than £24.000 for road work in the council’s area.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/THD19380601.2.54
Bibliographic details
Timaru Herald, Volume CXLIV, Issue 21051, 1 June 1938, Page 8
Word Count
94ROADS AND BRIDGES Timaru Herald, Volume CXLIV, Issue 21051, 1 June 1938, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Timaru Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.