NEW AIRPORT.
First Sod Turned By Mayor. IN TOWN AREA. Press Association—Copyright. Timaru, September 1. The first sod in the construction of the Timaru municipal airport was turned today by the Mayor, Mr. P. C. Vinnell. The airport which will be constructed in accordance with the A class of the British Air Ministry, is estimated to cost more than £25,000 and will provide work for upwards of 70 men for a year. The site is at the south end of the town on the borough boundary.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/STEP19360902.2.62
Bibliographic details
Stratford Evening Post, Volume IV, Issue 224, 2 September 1936, Page 7
Word Count
86NEW AIRPORT. Stratford Evening Post, Volume IV, Issue 224, 2 September 1936, Page 7
Using This Item
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.