WORK AT OTIRA TUNNEL.
■» - . It is understood that the work at the Arthur's Pap tunnel, Otira end, is progressing satisfactorily. Electric locomotives are now running al Olmi. and are working very well. i mining thi'ee-cuuu--ters of a. mile- , into Hie tunnel, lapidly eacrying away Wm excavated material. The extreme fae-e of the woik lp now 1£ miles fiom the Otira porta) at that end. Work at the Bealey end of the tunnel is going along fairly well. The ground theie, although not ao.wct as at Otira, requires a great deal of "timbering. Work could be lound for fully sixty more men on the tunnel ctmK&t£ could-
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19101205.2.97
Bibliographic details
Evening Post, Volume LXXX, Issue 135, 5 December 1910, Page 8
Word Count
106WORK AT OTIRA TUNNEL. Evening Post, Volume LXXX, Issue 135, 5 December 1910, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.