Refinery work for $8.5M approved
PA Whangarei The ‘'all clear” on w'ork worth §8.5 million on a tank “farm" for the Marsden Point oil refinery expansion was given to three Whangarei firms yesterday. Whangarei Engineering and Construction. Ltd. Culham Engineering. Ltd, and Thorburn and Robinson. Ltd. w’on a sub-contract to build 16 big steel tanks for the refinery in August, but were asked to suspend work on them by the main tank contractor. Chicago Bridge and Iron Company. About 7000 tonnes of steel plate began arriving in the firm’s yards yesterdav and work began. Culham won the first contract to build four complete tanks and now shares in the contract to build 16 more.
It w’ill build the tops and bottoms of the 16 tanks. W.E.C.O. w’ill roll the plate for the sides and Thornburn and Robinson will build the roof structures and other equipment.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19811117.2.33
Bibliographic details
Press, 17 November 1981, Page 3
Word Count
145Refinery work for $8.5M approved Press, 17 November 1981, Page 3
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Copyright in all Footrot Flats cartoons is owned by Diogenes Designs Ltd. The National Library has been granted permission to digitise these cartoons and make them available online as part of this digitised version of the Press. You can search, browse, and print Footrot Flats cartoons for research and personal study only. Permission must be obtained from Diogenes Designs Ltd for any other use.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.