IMPROVEMENTS TO THE CHRISTCHURCH AIRPORT.—A newly-taken aerial photograph showing, on the left, the hardstanding area for visiting aircraft. The estimated cost of this work exceeds £60,900. In the foreground is the terminal building. Immediately behind the building, work is progressing on the reconstruction of the approaches and parking area.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19610526.2.55
Bibliographic details
Press, Volume C, Issue 29523, 26 May 1961, Page 7
Word Count
49IMPROVEMENTS TO THE CHRISTCHURCH AIRPORT.—A newly-taken aerial photograph showing, on the left, the hardstanding area for visiting aircraft. The estimated cost of this work exceeds £60,900. In the foreground is the terminal building. Immediately behind the building, work is progressing on the reconstruction of the approaches and parking area. Press, Volume C, Issue 29523, 26 May 1961, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.