I—C. 8.

C— 8

1914. NEW ZEALAND.

DRAINAGE OPERATIONS IN HAURAKI PLAINS: REPORT FOR THE YEAR ENDED 31st MARCH, 1914; TOGETHER WITH STATEMENT OF ACCOUNTS.

Presented to both Houses of the General Assembly pursuant to Section 10 of the Hauraki Plains Act, 1908.

SlB » — Department of Lands and Survey, Wellington, 2nd June, 1914. _ I have the honour to submit herewith the report on the drainage operations in the Hauraki Plains for the past year, in accordance with the provisions of the Hauraki Plains Act, 1908. Valuations.— During the year 2,178 acres were subdivided into rural farms and reserves the valuation of this area being £18,240, making a total of 32,525 acres, valued at £178,250 now settled and revenue-producing. A further area of 2,172 acres, valued at £15,070, will be offered for selection very shortly. This therefore shows a reclaimed-swamp area of 34,697 acres of a capital value of £193,320. No credit has been taken of the large area of land utilized as roads, drains, &c. Land proposed to be opened.— -During August an area of 2,172 acres in the vicinity of Waitakaruru and Ngarua will be available for selection. In addition an area of about 2 000 acres at Ngarua and Mangawhero should be far enough advanced for selection before the'end of the next financial year. The total expenditure under the Act has now been as follows :— For the year ended 31st March, 1908 5 070 0 0 1909 ;;; 5 c 1910 ... . ... 22,235 2 11 1911 ... ... ... 32,103 14 0 1912 ... 40,084 13 1 1913 ... ... ... 26,608 1 3 1914 ... ... ... 21,467 18 2 Tota l ■•• ••■ ■•• ... £159,241 14 11 The detailed report of the Land Drainage Engineer, Mr. J. B. Thompson, deals extensively with the varied operations of the works on the Hauraki Plains under his control, and the result testifies to the great zeal and ability displayed by the Engineer and his assistants. At an early opportunity I hope to inspect and visit the works in progress. I am, &c, Jas. Mackenzie, The Right Hon. W. F. Massey, Minister of Lands. Under-Secretary for Lands. Statement of Accounts (as required by Section 10 of the Hauraki Plains Act, 1908) for the Year ended 31st March, 1914. imo ownT i. R eceipts. Expenditure. 1913—315t March. £s> <J. 1914—315t March To Balance—Cash in Public Account .. 2,778 51 By Expenditure— £s d ,„,, ~ .„ . „ , Travelling allowances and expenses, m t i~~, arOh - £s' d - cam P allowances, and general adTo Land-sales .. .. 757 10 0 ministration expenses .. .. 604 11 9 5? nts ,, '" " 6>718 2 3 Purchase and equipment of dredges Miscellaneous .. 659 2 5 and launches, maintenance and 8,134 14 8 ■ working expenses .. .. 1,523 19 6 Advances made by the Drainage-works, clearing channels, New Zealand State- building stop-banks, and all exguaranteed Advances penses incidental thereto 13 029 10 4 Office •• .. 10,000 0 0 Sinking artesian wells . " 'sil 9 R Debentures issued Thames office, upkeep of .. 120 9 0 under the New Zea- Compensation for lands acquired .. 3 202 18 6 land Loans Act, 1908 5,000 0 0 Expenses in connection with deben- ■ 15,000 0 0 tures issued .. ~ ... 036 Payments on loans— Interest .. .. .. i ; 8 30 4 6 Repayment of principal .. .. 644 11 8 Balance—Cash in Public Account .. 4,445 1 7 £25,912 19 9 £27,912 19 ~9

C.r-8

2

Loan Account. 1914—315t March. £ s. d. ' 1913—1st April. To Balance . .. .. 134,741 10 3 By Balance due to Loans to Local Bodies' £ s. d. Account (on originalloan of £31,000) 36,118 4 10 1914—315t March. By Year's interest at 4 per cent, per annum 1,444 14 7 Advances made by the New Zealand State-guaranteed Advances Office — No. 1 loan—Balance .. .. 4,746 5 0 No. 2 „ „ .. •• 4,746 5 0 No. 3 „ „ .. •• 4,784 7 6 No 4 „ „ ■• ■■ 9,568 15 0 No 5 ~ „ •• ■• 24,109' 7 6 No. 6 „ „ .. •• 9,717 10 0 No 7 „ „ •• •• 9,801 5 0 No. 8 „ „ .. •• 9,801 5 0 No. ' 9 „ „ . • • • 4,934 7 6 No. 10 „ 4,969 3 4 No. 11 „ „ • ■ • • 5,000 0 0 Debentures issued under New Zealand Loans Act, 1908 .. .". 5,000 0 0 £134,741 10 3 j £134.741 10 3

REPORT BY LAND DRAINAGE ENGINEER. I have the honour, in accordance with the provisions of the Hauraki Plains Act, 1908, to report upon the various operations carried out during the year ending on the 31st March, 1914. As in past years, the development and maintenance of the land-drainage system has been actively carried on, and existing drainage and road-formation improved as much as possible. As no county rates are payable upon Hauraki Plains lands, and no special maintenance levy has as yet been made, the upkeep of roads and drains, &c, has so far been a charge upon special grants and the Hauraki Plains Settlement Account. During the past year a further area of 2,392 acres was made available for selection and is now in occupation. To date the total area reclaimed and settled is 32,402 acres, and this area is occupied by some 227 settlers. This transformation of previously useless swamp into drained farms will result in a valuable addition to the dairying land of the province. The settlers are making great improvements in every direction, and the whole area of the swamp is very rapidly changing into good dairy farms. Naturally it is a big fight for new settlers, but they are Very energetic and progressive, and the Department strives to assist them in every reasonable way. In' each particular work dealt with hereafter, totals are given showing the position the various works have reached as at the 31st March, 1914, and details of all classes of work executed during the financial year are shown separately under the heading of " Works performed." It will be neither possible nor economical in the future to bring in large areas for settlement yearly, as this would prove costly. A large portion of the swamp will gradually improve itself by reason of existing drains, and this is preferable to going in for a "forcing" policy. The result will be the same in the end, but at less cost. Pkikstman Dbedgbes. During the past year two Priestman dredgers have been engaged in completing the widening of the Piako River between the Waikaka Canal and Kerepeehi. This work was commenced during 1912, and during March, 1914; the widening of this stretch, a distance of very nearly 5 miles, was completed, the river for this distance now averaging 66 ft., whereas formerly it was in places not more than 30 ft. wide. The effect of this work is especially noticeable at the Narrows, just above the Puhanga Canal, where the flood-waters always were congested, whereas now the water is not retarded to nearly the same extent, and an even flow is assured. During the fresh of December, 1913, this result was particularly emphasized, for, although the river was very high at Tahima, the water round Kerepeehi did not rise within several feet of its former height. After the fresh began to subside the water fell remarkably quickly, instead of remaining at the same level for weeks, as was formerly the case. All the spoil excavated was deposited on the banks of the river, and will provide material for a good road-formation and stop-banks at a later date. The stop-bank from Kerepeehi to the south end of the Puhanga Canal was strengthened considerably by the spoil being shifted back against the existing bank, and when this work is completed this portion, which formerly had to withstand the biggest strains in flood-time, will be rendered absolutely safe. The amount of spoil removed for the year was 147,740 cubic yards, costing 3'2d. per cubic yard. This cost covers all charges, including wages, supplies, repairs, idle time, and holidays. Owing to the strike curtailing the supply of coal, both dredgers were idle for some weeks, and advantage was taken of this opportunity to completely overhaul No. 2 dredge. This dredge was dismantled with the exception of the chutes, and all worn parts were renewed. The heaviest work was the placing in position of a new wheel-race, which weighed over a ton, the original one being worn through in several places. All the lifting of machinery was accomplished by

3

C—B

No. 1 dredge, which also was overhauled, but did not require so much attention. The cost of this overhaul was about £200, and has been charged against the work. Since the overhaul No. 2 dre<Jge has been working more efficiently than previously, and I consider that the repairs could not have been carried out better than they were. In about a year's time No. 1 dredge will require an overhaul of a similar nature, as the wheel-race is showing signs of wearing through. Waitakaruru-Maukoro Canal . Owing to both dredgers being engaged on the Piako River improvements, no dredging was undertaken on this canal during the past year. However, a drain 10 ft. wide on top was constructed as far as Torehape, a distance of 6 miles 20 chains from the Hauraki Gulf. Of this distance, 189 chains has been dredged, whilst for 85 chains, 5 ft. of peat has been sluiced out to a width of 40 ft., leaving a distance of 2 miles 46 chains of 10 ft. drain constructed. The latter portion of the country traversed by this dram is very solid peat country. The fall from the end of this drain to the sea is over 20 ft., and therefore renders it impracticable to construct a canal with a dredge for a large portion of this distance. However, every endeavour has been made to utilize this drain as a catchment-drain, and at the present time there are only two streams that require outlets in order to complete the purpose for which it was intended. These two are the Waikumete and the Torehape, both of which will be tapped during the comingyear, as the Department will construct the Torehape outlet, whilst the Waikumete outlet will be accomplished by private enterprise, as the land through which it passes is freehold. Waikaka Canal. This canal, which was completed in 1911, lias been standing remarkably well, as all the traffic up and down the river passes through this waterway. Some further improvements to this canal are contemplated as opportunity offers. Piako and Waitoa Rivers Improvement. The works detailed under the heading "Priestman dredgers" describe all the works that have been carried out in the above connection, for which a special vote of £2,000 for two years was obtained in 1912. In the year ending 31st March, 1913, the sum of £465 was expended in dredging the Piako River, being only for a period of four months, whilst during the year under review a sum of £2,073 13s. sd. was expended, practically all in dredging, a small sum being utilized in removing spoil from alongside the river-banks. As mentioned before, the work that has been carried out has been especially beneficial to the reaches above Kerepeehi, and as a result the flood-waters do not become so congested as formerly, and are got rid of very quickly. It has not been possible, so far, to undertake any work in connection with the removal of the hard bars in the Waitoa River, but it is hoped to do so shortly. Stop-banks. The total length of stop-banks (or levees) that has been constructed is 27 miles 50 chains, a length of 8 chains having been completed along the Waitakaruru Stream during the year! In addition the Department constructed 71 chains of stop-bank along the Waitakaruru Stream, where the Waitakaruru Loan Block has frontage to the stream. This was not constructed out of Hauraki Plains funds, but forms part of the whole scheme for preventing the flood-waters from the stream overflowing the adjacent Crown land. During the year there has not been a case where the banks have been washed away, as, where they are exposed, special protections have been constructed from time to time. Wherever necessary the banks have been strengthened, and this policy will be carried out in the future. Formed Roads. The total length of formed cart-roads, in most cases with a drain en each side, is now 53 miles 78 chains, the distance formed for the year being 3 miles 50 chains, all the work being new formation. In addition some 3,000 cubic yards of sand was utilized in blinding and raising peat roads within the Waitoa Block, drays and scoops being the method of carting. This lias practicallv completed the road-formation within the Waitoa Block, although in a few low places it will be necessary to raise the roads still further. A special vote of £1,595 was obtained to assist in the construction of the Waikaka Tramway Road, and during the past year the sum of £402 has been expended on this work. Over a mile of drain was constructed, and in February the actual road-construction was commenced. Before spreading the spoil, which is obtained from the upper end of the road, fascines had to be laid to ensure a solid foundation. Six trucks were built and are being used continual!v on the tram-line, which at the same time is being moved to the centre of the road instead of being on the side, as previously. At the end of the year over 1,600 cubic yards had been trammed and utilized in the preliminary ballasting. During the summer six drays have been engaged continually in carting spoil for the Patetonga Road, which passes through peat country. This has been very heavy work; the amount of spoil required per chain has in some cases been as high as 60 cubic yards. All roads are being maintained as well as possible. Road-banks . The total length of road-banks— i.e., spoil from road-drains removed about 4ft. from the edge thereof and spread—is still 13 miles. During the year nothing has been done to convert any of these into cart-roads. Quite half of the above distance is not required for the subdivision of the land, and has been left mainly as a reserve. This distance will be reduced, as at Waikaka some of the roads will be ballasted during the coming summer.

C—B

4

Drains in Operation. The total mileage of drains in operation is now 302 miles, and includes stop-bank drains, subdivisional drains, road-drains, service-drains, and outlets of all descriptions. This is an increase of 26 miles during the year. At Waitoa and Waikaka very heavy timber was met with while constructing the main drains, and consequently the work was slow and costly. Snagging. The work carried out under this heading has been confined solely to the Waitoa River, the total distance snagged to date being 18 miles 17 chains, of which 2 miles 22 chains has been covered during the past year. Of this a distance of 1 mile 22 chains was snagged by day labour, which completed the clearing of the river as far as the Piranui Stream. From this point onwards to the Waihekau Stream, a distance of 3 miles 45 chains, a contract was let in December, and up to date a distance of 1 mile has been completed. The balance of this work will be completed during the coining year. At present the Department's punt is being utilized in weeding the river from the Ohine Stream southwards to the junction with the Piako River. This work will be an ever-recurring one, as, owing to the sluggish nature of the stream, the growth of weeds and water-lilies in a season is prolific. No work of this nature has been carried out on the Piako River during the year. All the above work has been done by special vote. The expenditure for the year was £523 2s. 4d. Wharves. The total number of wharves constructed to date is fourteen, none having been constructed during the jea,r. The Patetonga Wharf, which was purchased in the previous year, was redecked and strengthened. Various small improvements and repairs to the wharves were attended to as required. A small wharf will be erected at the south end of the Puhanga spillway. Flood-gates. The total number of gates now in use is fifty-four, three having been removed during the year owing to their being no longer necessary. This was due to the water that was formerly sent down certain outlets being diverted into fresh channels, so as to endeavour to keep a continuous flow of water and so keep the outlets for the gates free from silt. At the outlets of five of the gates Burnings were erected, which have the effect of rendering the gates more efficient and not so liable to damage from erosion. As usual, all gates have been inspected regularly and repairs effected. Bridges, Culverts, etc. The total number of sill bridges to date is ninety-two, small bridges on piles eight, one two-span bridge, and five culverts. During this coming year it is intended to construct a permanent bridge across the Waita-karuru-Maukoro Canal at Waitakaruru. Private Telephone-line to Works. As usual, this line has been of great assistance in facilitating the progress of the works, as it saves an unnecessary amount of travelling. The total distance of this line, which extends from Kerepeehi to Waitakaruru, is 14 miles. Buildings. The total number of buildings on the works is thirty-eight, which are used as quarters, stores, wharf-sheds, &c. One wharf-shed was erected during the year, whilst additions were made to the foreman's hut at Waikaka. All buildings are in very fair order. Floating Plant. This plant consists of the following : Two Priestman grab dredgers complete, one steamer, three oil-launches, six pontoons, and sundry small punts. Since last report one launch has been transferred to the Rangitaiki drainage-works, whilst three pontoons have been procured in order to carry out the metalling scheme for the plains. All have been kept in good repair. Artesian Boring Plant. During the year twenty-three bores were sunk by the Department's plant, bringing the total up to eighty-two. The flows of water obtained have varied from 1,680 gallons to 96,000 gallons per diem. No unmineralized water has been struck, nevertheless the mineralized water does not seem to have any detrimental effect on stock. All bores have been sunk for the settlers on very easy terms, extending over periods suitable to themselves, whilst in case of a transfer of section arrangements have been made so that the cost is refunded before the transfer is obtained. The total cost of the bores sunk to date, including wages, material, &c, is £1,707 19s. 7d., whilst the sum repaid so far is £474 Is. 6d., some £263 14s. lOd. of this being repaid during the current year. Schedules of all bores sunk during the year are attached, and disclose the fact that the country in each locality has its peculiar strata.

a—a

5

Works performed during the Year. The following works were carried out under either the piecework or co-operative contract system : — M. ch. Double-drain and road formation ... ... ... ... 0 13 Widening and deepening road-drains and spreading spoil ... 8 17 New drain and road formation... ... ... ... ... 0 17 Clearing scrub and bush for road-formation —Hauraki Plains ... 2 17 ~ ~ Patetonga South ... 0 39 Cleaning road-drains ... ... ... ... ... ... 36 49 New road-drains ... ... ... ... ... ... 1 25 Road-formation —Hauraki Plains ... .. . . . . 0 15 ~ Waitakaruru Loan Block ... ... .. 0 52 New outlet drains .... ... ... ... ... ... 18 14 Deepening and widening outlet drains ... • ... ... ... 25 33 Cleaning outlet drains ... ... ... ... 22 70 New subdivisional drains ... ... ... ... ... 0 29 Deepening subdivisional drains ... "... ... ... 155 Cleaning stop-bank drains ... ... ... ... ... 10 50 Stop-bank and drain formation—Hauraki Plains ... ... 0 8 ~ ~ Waitakaruru Loan Block ... 0 71 Stripping peat —Waitakaruru Canal ... ... ... ... 0 1 Snagging Waitoa River ... ... ... ... ... 1 0 Removing heavy timber from drains ... ... ... ... 2 40 Fencing ... ... ... ... ... ... 1 57 Distance covered ... ... ... ... ... 135 32 Under this heading the following were also supplied : Fascines for road purposes, 3,516 bundles; posts, 718; timber for bridges, 6,000 ft.; piles for wharves, 10; sleepers for tramway, f,990; metal supplied at Pipiroa, 2,650| cubic yards; metal loaded at Kauaeranga, 82 cubic yards; metalling of Turua Road (166 chains), 2,739 cubic yards. The following works were carried out by day labour : — M. oh. Blinding and raising peat roads with sand (3,000 yards) ... ... 3 40 Forming roads—Hauraki Plains ... .. ... 3 20 New road-drains ... ... ... ... ... ... 1 19 Deepening road-drains ... ... ... .. ... 14 64 Cleaning road-drains ... ... ... ... ... ... 33 27 New outlet drains .... ... ... ... ... ... 3 3 Deepening and widening outlet drains ... ... ... ... 10 33 Cleaning outlet drains ... ... ... ... ... 16 60 Strengthening stop-banks ... ... ... ... ... 3 60 Cleaning stop-bank drains ... ... ... ... ... 16 56 Deepening stop-bank drains ... ... ... ... ... 0 18 Discing and rolling roads ... ... ... ... ... 20 0 Snagging Waitoa lliver ... ... ... ... ... 1 22 Spreading spoil on roads ... ... ... ... ... 071 Erection of fence ... ... ... ... ... ... 0 20 Spreading metal on roads ... ... ... ... ... 2 0 Distance covered ... ... ... ... ... 131 33 Under this heading the following were also performed : Construction of bridges, 2; construction of culvert, 1; construction of flumings for flood-gates, 6; construction of shed, 1; artesian bores for settlers, 23; supply of fascines, 1,400 bundles; spoil removed by dredgers, 147,740 cubic yards. Cattle. Of the cattle purchased in 1911, the remaining thirteen were sold during last year for £52 19s. The total amount expended under this heading was £350 lis., whilst the return from auction, &c., was £508 9s. 9d., which discloses a very good return considering that these were only grazing on the partly drained country. Thirteen head of cattle have had to be written off the books on account of deaths, &c. Fires. Early in 1914 a fire commenced at Ngarua, and, fanned by the wind, rapidly spread towards Waikaka, and threatened the tram-line leading from the wharf. Men were instantly stationed to protect the line and fight the fire, and I can safely say that the damage sustained'was very slight. About 50 acres of grass was burnt, whilst in a few places the sleepers on the tram-line were burnt, but have since been repaired. A large area of unoccupied Crown land was burnt, and as it was considered advisable to sow grass-seed on this area, especially near the line, where it will act as a break, tenders were invited for the supply of grass-seed, and are returnable shortly. Flax Areas. During the year no flax areas were offered for auction, but the sum of £2 16s. 9d. was received from areas let during the previous year. The fires of January and succeeding months burnt several large areas of flax ready to be milled, and I do not consider that any revenue will be derived from this source during the coming year. Metalling of Roads. During the financial year ending March, 1913, a sum of £3,500 was voted for the metalling of roads, whilst during last year a further sum of £3,000 was voted.

G.—B

6

As pointed out in the last report, a distance of 90 chains of the Turua Road was let by tender at a cost of £1,002 7s. 6d., whilst last November a further section of 76 chains was let at £877 16s. This work was completed during March, and a very satisfactory job has been carried out by the contractors. This is all the metalling that has been done on the eastern side of the Piako River. On the western, side of the river a contract was let for the supply only of gravel for the Pipiroa—Waitakaruru Road, the tramming and spreading being undertaken by the Department's own plant and day labour. Altogether 2,650 cubic yards of shingle was delivered at Pipiroa, and this sufficed to metal 160 chains of the above road. Owing to the excessive cost of the gravel delivered by scows, and also to the fact that the sea-beach gravel does not bind too well, it was decided to build punts and convey the gravel from the Kauaeranga River at Thames. The strike in November and December, however, interfered with these plans, and in spite of the timber being ordered in November, it was not till after the New Year that the construction of the punts could be put in hand. Two punts were built by contract, whilst a third was purchased. The cost of the three punts was £610, and these can each hold on an average 30 cubic yards when the tides are suitable. On the wharf at Pipiroa a hoisting-winch was elected for unloading the punts direct into the trucks. The loading has been done by contract, whilst an oil-launch tows the punts to Shortland Wharf, where the s.s. " Hauraki " takes them in tow to Pipiroa. This work was undertaken late in March, and consequently only 82 cubic yards was punted across during that month. The expenditure under this heading out of special grants was £4,095 3s. 4d., of which details are as follows: Bagnall Bros. —Contract 3M, Turua Road, £1,002 7s. 6d.; Bagnall Bros.—Contract 3M, extension Turua Road, £602 18s. 3d. ; Winstone Limited—Contract 4M, supply at Pipiroa, £1,126 9s. 3d.; wages for Pipiroa—Waitakaruru Road, £627 14s. 3d.; supplies, £36 3s. 2d.; punts, &c, £699 10s. lid. : total, £4,095 3s. 4d. Surveys. During the year some 2,392 acres were surveyed into sections at Waikaka and Kerepeehi for settlement purposes. Various other small surveys were completed, whilst at the present time the field-work of 2,000 acres at Ngarua and Waitakaruru is in hand. The surveys of the Patetonga and Kerepeehi townships are also in hand, and will be completed during the winter. Wherever necessary for the carrying-on of the works, engineering surveys have been completed for present and future requirements. Valuations. During the year 2,178 acres were subdivided into rural farms and reserves, the valuation of this area being £18,240, making a total of 32,525 acres, valued at £178,250, now settled and revenue-producing. A further area of 2,172 acres, valued at £15,070, will be offered for selection very shortly. This therefore shows a reclaiined-swamp area of 34,697 acres, of a capital value of £193,320. No credit has been taken for the large area of land utilized as roads, drains, &c. Works Expenditure during the Year Piecework contract absorbed the sum of £5,484 13s. 6d. from the Hauraki Plains Settlement Account, and £1,377 12s. sd. from special grants. Day labour absorbed a sum of £7,764 3s. 2d. from the Hauraki Plains Settlement Account, whilst £3,263 10s. 7d. was spent out of special grants. All the above were paid from local imprest. Principal Works proposed. The principal works to be carried out during the next financial year are as follows :— (1.) Improvements to Piako River. (2.) Continuance of cart-road formation (mainly at W'aikaka). (3.) General drainage development, so as to bring in new areas for settlement. (4.) Prosecution of metalling of main roads. (5.) Maintenance and improvements to existing works. (6.) Formation of access roads leading to Hauraki Plains. Land for Township and Village Sites. During last year 175 acres were purchased at Kerepeehi, and also 25 acres at Waikaka, in order to provide town and village allotments in the above localities. The survey of both these areas is in hand, and will be completed shortly, and they will then be available for sale. These lands were purchased out of the Hauraki Plains Settlement Account. Land proposed to be opened. During August an area of 2,172 acres in the vicinity of Waitakaruru and Ngarua will be available for selection. In addition an area of about 2,000 acres at Ngarua and Mangawhero should be far enough advanced for selection before the end of the next financial year. Work has been commenced on the Awaiti Block at Netherton, containing about 2,000 acres, and I consider that this will be available for settlement during the year, provided the Public Works Department carry out their scheme to stop-bank the Waihou River, which at the present time floods this particular block. In my last report mention was made of a block of hill and swarup land adjoining the Hauraki Plains at Waitakaruru, which it was proposed to open up for selection. Unfortunately this could not be carried out, but, without fail, this area will be available during the coming spring. The main roads to this block have all been constructed, whilst the by-roads are now under construction.

7

C—B

General. Office, draughting, and field staffs have been kept very busy during the past year, and a considerable amount of engineering and section surveys have also been made. The attached plan shows the present position of operations, and no effort is being spared to give effect to the Government's policj' of making swamp lands available. My thanks are due to Mr. R. G. Macmorran, Assistant Land Drainage Engineer, who is in local charge, and to Mr. H. A. Joyce and all other members of the drainage staff, who have worked so hard and loyally to ensure success of all operations. I have, &c, J. B. Thompson, Land Drainage Engineei The Under-Secretary, Department of Lands and Survey.

APPENDIX. Artesian Bore No, 60: Section 1, Block 11, Waihou. (Mr. White.) Depth in nj. -i Depth in „, ~ Feet. Detal,s - Feet. Details - -69 69 ft. clay. 163 17 ft. pumice sand. 73 4 ft. rotten timber. 166 3 ft. rotten timber. 88 15 ft. sand. 180 14 ft. pumice sand. 102 14 ft. rotten timber. 185 5 ft. clay. 137 35 ft. pumice sand 195 10 ft. sand. 146 9 ft. rotten timber. 201 6 ft. rotten timber. Total depth, 201 ft. Flow, 9,600 gallons per day.

Artesian Bore No. 61 : Section 2, Block 11, Wathou Survey District. (Crawford Bros.)

D in Details. 56 56 ft. clay. 61 5 ft. sand. 74 13 ft. clay. 82 8 ft. drift sand. 90 8 ft. rotten timber. 98 B ft. white clay. 108 10 ft. pumice sand. 110 2 ft. rotten timber. 126 16 ft. pumice sand. 129 3 ft. rotten timber.

Depth in _ . ~ Feet. Details. 139 10 ft. pumice sand. 141 2 ft. rotten timber. 153 12 ft. pumice sand. 158 5 ft. clay. 177 19 ft. pumice sand. 180 3 ft. rotten timber. 209 25 ft. pumice sand. 221 12 ft. rotten timber. 261 40 ft. pumice sand.

Total depth, 261 ft. Flow, 4,800 gallons per day. Artesian Bore No. 62 : Section 1, Block XI, Thames. (Mr. Higgins.)

Depth in Details Feet. details. 110 110 ft. clay. 122 12 ft, drift sand. 150 28 ft. shingle. 158 8 ft. clay. 173 15 ft. pumice sand. 175 2 ft. rotten timber. 191 16 ft. pumice sand. 195 4 ft, clay. 203 8 ft. pumice sand. 205 2 ft. rotten timber. 213 8 ft. drift sand. 218 5 ft. rotten timber. 221 3 ft, shingle.

Depth in n , ~ Feet. Details. 223 2 ft. rotten timber. 245 22 ft. pumice sand. 247 2 ft. rotten timber. 288 41 ft. sandstone. 298 10 ft. rotten timber. 302 4 ft. pumice sand. 307 5 ft. rotten timber. 318 11 ft. pumice sand. 323 5 ft. rotten timber. 337 14 ft. pumice sand. 340 3 ft. clay. ' 350 10 ft. black sand.

Total depth, 350 ft. No flow obtained. Artesian Bobe No. 63 : Section 1, Block XI, Thames. (Mb. Higgins.)

Depth in n + -i Feet. Detalls - -133 133 ft. clay. 137 4 ft. rotten timber. 148 lift. clay. 161 13 ft. sand. 163 2 ft. rotten timber. 180 17 ft. clay. 225 45 ft. drift sand. 228 3 ft. rotten timber. 245 17 ft. pumice sand. 247 2 ft. rotten timber. 266 19 ft. clay. 269 3 ft. rotten timber. 275 6 ft. sand. 280 5 ft. shingle. 296 16 ft. sand. 301 r> ft. rotten timber. 329 28 ft. pumice sand. Total depth, 520 ft.

Depth in „ , ~ Feet. Detalls - -333 4 ft. rotten timber. 334 I ft. rook. 338 4 ft. rotten timber. 355 17 ft. clay. 357 2ft. .shingle. 385 28 ft. pumice sand. 398 11 ft. clay. 414 16 ft. pumice sand. 416 2 ft. rotten timber. 427 11 ft. pumice sand. 432 5 ft. rotten timber. 467 35 ft. pumice sand. 472 5 ft. clay. 487 15 ft. pumice sand. 495 8 ft. clay. 499 4 ft. rotten timber. 520 21 ft. pumice sand. 17,280 gallons per day.

C—B.

8

Aetbsian Bore No. 64: Section 6, Block XI, Thames. (Mr. Christie.)

Depth in „ , ~ Feet. Detalls - -60 60 ft. clay. 79 19 ft. rotten timber. 100 . 21 ft. clay. 103 3" ft. sand. 109 6 ft. rotten timber. 130 21 ft. clay. 145 15 ft. rotten timber. 148 3 ft. sand. 151 3 ft. rotten timber. 179 28 ft. pumice sand. 185 6 ft. rotten timber. 212 27 ft. pumice sand. 221 9 ft. rotten timber. 238 17 ft. pumice sand. 241 3 ft. rotten timber. 248 7 ft. pumice sand. 251 3 ft. rotten timber. 258 7 ft. clay.

Depth in ~ , ~ /eet. Details. 262 4 ft. sand. 273 lift. clay. 277 4 ft. rotten timber. 285 8 ft. sand. 286 1 ft. rotten timber. 292 6 ft. sand. 295 3 ft. rotten timber. 303 8 ft. clay. 307 4 ft. rotten timber. 317 10 ft. sand. 325 8 ft. clay. 345 20 ft. pumice sand. 350 5 ft. rotten timber. 396 46 ft. pumice sand. 404 8 ft. rotten timber. 469 65 ft. pumice sand. 504 35 ft. clay.

Total depth, 504 ft. Flow, 9,600 gallons per day. Artesian Bore No. 65 : Section 13. Block XI, Thames. (Mr. Chean.)

Depth in _ ~ Feet. I)etalls - -58 58 ft. clay. 63 5 ft. rotten timber. 71 8 ft. clay. 74 3 ft. sand. 129 55 ft. clay. 148 19 ft. sand. 158 10 ft. clay. 165 7 ft. sand. 248 83 ft. clay. 255 7 ft. sand. 262 7 ft. rotten timber. 294 32 ft. pumice sand. 296 2 ft. rotten timber.

Depth in „ , ~ Feet. Details. 313 17 ft. pumice sand. 323 10 ft. rotten timber. 337 14 ft. pumice sand. 342 5 ft. rotten timber. 352 10 ft. pumice sand. 358 6 ft. rotten timber. 365 7 ft. pumice sand. 367 2 ft. rotten timber. 370 3 ft. sand. 372 2 ft. rotten timber. 378 6 ft. clay. 420 42 ft. pumice sand.

Total depth, 420 ft. Flow, 2,880 gallons per day. Artesian Bore No. 66: Section 22, Block XI, Thames. (Mr. R. Connor.)

Depth in tw -i Feet. Detalls - -52 52 ft. clay. 63 11 ft. sand. 74 11 ft. white clay. 82 8 ft. rotten timber. 99 17 ft. pumice sand. 112 13 ft. rotten timber. 118 6ft. sand. 124 6 ft. rotten timber.

Depth in -n, . ~ Feet. Betalls - -145 21 ft. pumice sand. 147 2 ft. rotten timber. 149 2 ft. sand. 154 5 ft. rotten timber. 162 8 ft. pumice sand. 166 4 ft. rotten timber. 169 3 ft. pumice sand.

Total depth, 169 ft. Flow, 2,640 gallons per day. Artesian Bore No. 67: Section 38, Block X, Thames. (Mr. Palmer.)

Depth in , ~ Feet. Details - -38 38 ft. clay. 44 6 ft. sand. 52 8* ft. clay. 60 8 ft. sand. 67 7 ft. rotten timber. 89 22 ft. drift sand. 92 3 ft. rotten timber. 102 10 ft. pumice sand. 104 2 ft. rotten timber. 118 ft ft. pumice sand. 123 5 ft. rotten timber.

Depth in „ . .. Feet. Detalls - -43 4:3 ft. clay. 61 1? ft. sand. 72 11 ft. rotten timber. 76 4 ft. clay.

Depth in „ , ~ Feet. Details - -136 13 ft. pumice sand. 140 4 ft. rotten timber. 174 34 ft. pumice sand. 184 10 ft. clay. 218 54 ft. drift sand. 223 5 ft. shingle. 231 8 ft. clay. 239 6 ft. drift sand. 245 6 ft. rotten timber. 254 9 ft. shingle.

Total depth, 254 ft. No water obtained. Artesian Bore No. 68 : Section 38, Block X, Thames. (Mr. Palmer.)

Depth in „ , '~ Feet. Detalls - -81 5 ft. sand. 85 4 ft. rotten timber. 87 2 ft. sand. 90 3 ft. clay.

C—B:

A Typical View of Dredging-work.

Waikaka Creek Outlet, showing Land recently balloted for.

C— 8

Mr. P. Flynn's Homestead at Shelly Beach. Four years ago this country was covered with raupo 12ft. high.

Mangolds growing on Reclaimed Swamp Land, where Raupo 12ft. high grew Four Years ago.

C—B.

No. 2 Dredge excavating Spoil for Waikaka Tramway Road at Piako River Terminus.

No. 1 Dredge engaged on Ngarua Canal.

0;—8.

Ballasting Waikaka Tramway Road.

Junction of Patetonga and Waikaka Tramway Roads.—A Typical View of Waikaka Country.

9

C—B.

Artesian Boee No. 68: Section 38, Block X, Thames — continued.

Depth in t. . ■, Feefc Detalls - -102 12 ft. sand. 105 3 ft. rotten timber. 116 11 ft. pumice sand. 124 8 ft. rotten timber. 142 18 ft. pumice sand. 148 6 ft. rotten timber.

160 12 ft. pumice sand. 166 6 ft. clay. 108 2 ft. hard sand. 171 3 ft. rotten timber. 181 10 ft. pumice sand.

Total depth, 181 ft. Flow, 2,880 gallons per day. Artesian Bore No: 69 : Sectiom 2*, Block XI, Thames. . (Mr. Bond.)

Depth in ~ .. Feet. - Dutalls - -37 37 ft. clay. 52 15 ft. rotten timber. 92 40 ft. clay. 97 5 ft. rotten timber. 109 12 ft. sand. 131 22 ft. clay. 135 4 ft. sand. 144 9 ft. rotten timber. 149 5 ft. clay. 162 13 ft. pumice sand. 174 12 ft. clay. 177 3 ft. rotten timber. 180 3 ft. sand. 200 20 ft. clay. 203 3 ft. sand. 205 2 ft. rotten timber. 213 8 ft. clay. 222 9 ft. drift sand. 245 23 ft. rotten timber. 251 6 ft. clay. 255 4 ft. sand.

258 3 ft. rotten timber. 2G2 4 ft. shingle. 271 9 ft. drift sand. 278 7 ft. shingle. 280 2 ft. rotten timber. 284 4 ft. clay. 297 13 ft. pumice sand. 302 5 ft. rotten timber. 327 25 ft. sandy clay. 332 5 ft. rotten timber. 337 4 ft. white clay. 343 6 it. sand. 345 2 ft. clay. 363 18 ft. sand. 373 10 ft. rotten timber. 398 25 ft. pumice sand. 403 5 ft. rotten timber. 413 10 ft. pumice sand. 425 12 ft. clay. 453 28 ft. pumice sand. 457 4 ft. rotten timber.

Total depth, 457 ft. Flow, 12,000 gallons per day. Artesian Bore No. 70: Section 12, Block XI, Thames. (Mr. McKenzie.)

Depth in , ~ Keet. Details. 74 74 ft. clay. 87 13 ft. rotten timber. 90 3 ft. clay. 96 6 ft. sand. 104 8 ft. clay. 11l 7 ft. rotten timber. 121 10 ft. clay. 157 36 ft. drift sand. 165 8 ft. clay. 175 10 ft. drift sand. 185 10 ft. rotten timber. 189 4 ft. drift sand. 197 8 ft. shingle. 199 2 ft. rotten timber. 210 lift, shingle. 213 3ft. rotten timber.

Depth in „ , ~ Feet. ■ Uetallw - -217 4 ft. sand. 243 . 26 ft. clay. 249 6 ft. rotten timber. 265 16" ft. pumice sand. 281 - 16 ft. white clay. 310 29 ft. pumice sand. 312 2 ft. rotten timber. 327 15 ft. shingle. 330 3 ft. rotten timber. 342 12 ft. pumice sand. 345 3 ft. clay. 383 38 ft. pumice sand. 389 6 ft. rotten timber. 406 17 ft. pumice sand. 420 14 ft. clay.

Total depth, 420 ft. Flow, 17,280 gallons per day. Artesian Boris No. 71 : Section 3, Block XI, Thames. (Mb. Lixdsay.)

Depth in r , . •, Feet. DetalU - -71 71 ft. clay. 80 9 ft. rotten timber. 114 34 ft. clay. 119 5 ft. saiid. 124 5 ft. rotten timber. 12*8 4 ft. sand. 132 4 ft. rotten timber. 147 15 ft. sand. 151 4 ft. clay. 158 7 ft. sand. 161 3 ft. clay. 212 51 ft. drift sand. 220 B"ft. shingle. 227 7 ft. rotten timber. 229 2 ft. sand. 245 16 ft. white clay.

Depth in r> , ~ Feet. Detallß - -265 20 ft. drift sand. 273 8 ft. shingle. 279 6 ft. rotten timber. 306 27 ft. clay. 309 3 ft. rotten timber. 345 36 ft. pumice sand. 354 9 ft. clay. 371 17 ft. pumice sand. 373 2 ft. rotten timber. 393 20 ft. pumice sand. 403 10 ft. clay. 416 13 ft. pumice sand. 424 8 ft. clay. 429 5 ft. pumice sand. 439 10 ft. rotten timber. 451 12 ft. pumice sand.

Total depth, 451 ft. Flow, 17,280 gallons per day.

2—C. 8.

.0.-8.

Artesian Bobe No. 72: Section 2, Block XI, Thames. (Mb, Flynn.)

D f th + in Details. Feet. 105 105 ft. clay. 110 5 ft. rotten timber. 123 13 ft. clay. 132 9 ft. sand. 140 8 ft. rotten timber. 148 8 ft. clay. 162 14 ft. sand. 170 8 ft. clay. 183 13 ft. drift sand. 199 6 ft. sand. 209 10 ft. clay. 222 13 ft. rotten timber. 227 5 ft. clay. 239 12 ft. pumice sand. 241 2 ft, rotten timber. 288 47 ft, pumice sand.

D teV n 311 23 ft. rotten timber. 318 7 ft. clay. 328 10 ft. pumice sand. 331 3 ft. rotten timber. 347 16 ft. shingle. 349 2 ft. clay. 383 34 ft. pumice sand. 387 4 ft. clay. 413 26 ft. hard sand. 419 6ft. rotten timber. 429 10 ft. pumice sand. 439 10 ft. clay. 445 6 ft. pumice sand. 447 2 ft. rotten timber. 465 18 ft. pumice sand.

Total depth, 465 ft. Flow, 28,800 gallons per day. Artesian Bobe No. 73 : Section 7, Block XI, Thames. (Me. Peat.)

Depth in D t jj Feet. 67 67 ft. clay. 69 2 ft. sand. 93 24 ft, clay. 96 3 ft. rotten timber. 104 8" ft. sand.

109 5 ft. rotten timber. 117 8 ft. sand. 121 4 ft. rotten timber. 128 7 ft. sand. 136 8 ft. clay.

Total depth, 136 ft. Flow, 2,880 gallons per day. Artesian Bobs No. 74: Section 8, Block 11, Waihou. (Mr. Kneebone.)

Depth in Details. Feet. 44 44 ft. clay. 51 7 ft. pumice sand. 55 4 ft. clay. 62 7 ft. sand. 68 6 ft, clay. 72 4 ft. sand. 81 9 ft. clay.

De !Pth ™ Details. Feet. 87 6 ft. sand. 102 15 ft. rotten timber. 112 10 ft. clay. 130 1.8 ft. drift sand. 133 3 ft. clay. 137 4 ft. rotten timber.

Total depth, 137 ft. Flow very small. Artesian Bore No. 75 : Section 10, Block 11, Waihou. (Me. A. Wheeler.)

Depth in Details. Feet. 50 50 ft. clay. 60 10 ft. rotten timber. 73 13 ft. clay. 80 7 ft. rotten timber. 84 4 ft. sand. 98 14 ft. rotten timber. 110 1"2 ft. sand. 114 4 ft. rotten timber. 131 17 ft. pumice sand. 135 4 ft. rotten timber. 142 7 ft. pumice sand.

, 111 Details - -145' 3 ft. clay. 164 19 ft. pumice sand. 172 8 ft. clay. 175 3 ft. pumice sand. 178 3 ft. rotten timber. 180 2 ft. sand. 185 oft. clay. 195 10 ft. pumice sand. 200 5 ft. rotten timber. 227 27 ft. pumice sand.

Total depth, 227 ft. Flow, 1,650 gallons per day. Artesian Bonn No. 76 : Pound-site, Kopuarahi.

Depth in Details. Feet. 65 65 ft. clay. 72 7 ft. sand. 76 4 ft. clay. 83 7 ft. sand. 98 15 ft. rotten timber.• 101 3 ft. clay. 104 3 ft. sand. 11l 7 ft. clay. 139 28 ft. dri't'f sand. 144 5 ft. clay. 148 4 ft. pumice sand.

J)e^ bh . in Details. beet. 153 5 ft. rotten timber. 159 6 ft. pumice sand. 162 3 ft. rotten timber. 227 65 ft. pumice sand. 229 2 ft. rotten timber. 232 3 ft. pumice sand. 234 2 ft. rotten timber. 251 17 ft. pumice sand. 254 3 ft. clay. 270 16 ft. pumice sand.

Total depth, 270 ft. Flow, 4,320 gallons per day.

10

11

o.—B.

Artesian Bore No. 77: Section 9, Block II, Waihou. (Mr. Murdoch.)

D teV n 53 53 ft. clay. 72 19 ft. pumice sand. 81 9 ft. rotten timber. 97 16 ft. pumice sand. 100 3 ft. clay. 11l 11 ft. sand. 114 3 ft. rotten timber. 117 3 ft. sand. 119 2 ft. rotten timber. 154 35 ft. pumice sand.

Depth in ,* , ~ Feet. Details - -157 3 ft. clay. 162 5 ft. pumice sand. 164 2 ft. clay. 170 6 ft. pumice sand. 176 6 ft. claj 201 25 ft. pumice sand. 205 4 ft. clay. 227 22 ft. sand. 229 2 ft. clay. 270 41 ft. pumice sand.

Total depth, 270 ft. Flow, 4,320 gallons per day. Artesian Bore No. 78: Section 1, Block 11, Waihou. (Mr. White.)

Depth in ~ , ~ -Feet. l)oUlls - -40 40 ft. clay. 42 2 ft. sand. 49 7 ft. clay. 60 lift. sand. 62 2 ft. clay. 70 8 ft. pumice sand. 79 9 ft. rotten timber. 84 5 ft. pumice sand. 86 2 ft. rotten timber. 11l 25 ft. pumice sand. 114 3 ft. rotten timber. 128 14 ft. pumice sand. 130 2 ft. rotten timber. 134 4 ft. pumice sand. 143 9 ft.'clay. 147 4 ft. sand. 183 36 ft. clay.

Depth in n .. Feet. Detells - -184 1 ft. rotten timber. 190 6 ft. pumice sand. 194 4 ft. rotten timber. 202 8 ft. pumice sand. 204 2 ft. rotten timber. 246 42 ft. drift sand. 249 3 ft. rotten timber. 291 42 ft. pumice sand. 295 4 ft. rotten timber. 307 12 ft. pumice sand. 311 4 ft. rotten timber. 323 12 ft. pumice sand. 325 2 ft. rotten timber. 339 14 ft. pumice sand. 340 1 ft. rock. 344 4" ft. sand. 346 2 ft. rotten timber.

Total depth, 346 ft. Flow, 3,600 gallons per day.

Artesian Bore No. 79: Section 20,Block XI, Thames. (Mr. Darrow.)

Depth in ~ , ~ Feet. l)ctalls - -82 82 ft. clay. 94 12 ft. sand. 98 4 ft. clay. 102 4 ft. rotten timber. 104 2 ft. sand. 112 8 ft. rotten timber. 136 24 ft. sand. 141 5 ft. rotten timber. 158 17 ft. pumice sand. 162 4 ft. rotten timber. 186 24 ft. pumice sand. 194 8 ft. clay. 196 2 ft. sand. 200 4 ft. rotten timber. 207 7 ft. pumice sand. 218 11 ft. clay. 225 7 ft. pumice sand. 229 4 ft. rotten timber. 237 8 ft. pumice sand.

Depth in _ , ~ Feet. Dotails - -239 2 ft. clay. 253 14 ft. pumice sand. 257 4 ft. rotten timber. 262 5 ft. pumice sand. 264 2 ft. clay. 270 6 ft. pumice sand. ■ 273 3 ft. rotten timber. 277 4 ft. pumice sand. 279 2 ft. clay. 294 15 ft. pumice sand. 296 2 ft. rotten timber. 322 26 ft. pumice sand. 326 4 ft. rotten timber. 337 11 ft. pumice sand. 340 3 ft, clay. 388 48 ft. pumice sand. 392 4 ft, rotten timber. 407 15 ft. pumice sand.

Total depth, 407 ft. Flow, 3,840 gallons per day. Artesian Bore No. 80: Section 37, Block XI, Thames. (Mr. Schwahz.)

D t!r d^--42 42 ft. clay. 52 10 ft. sand. 56 4 ft, clay. 64 8 ft. sand. 68 4 ft. clay. 100 32 ft. pumice sand. 109 9 ft. shingle. 112 3 ft. rotten timber. 115 3 ft. sand. 118 3 ft. rotten timber. 130 12 ft. pumice sand. 142 12 ft. clay.

Depth in t, . ~ Feet. Details - -187 45 ft. pumice sand. 190 3 ft. clay. 202 12 ft. pumice sand. 204 2 ft. rotten timber. 219 15 ft. pumice sand. 222 3 ft. rotten timber. 248 26 ft. pumice sand. 250 2 ft. rotten timber. 255 5 ft. pumice sand. 257 2 ft. rotten timber. 261 i ft. pumice sand. 264 3 ft. rotten timber.

C—B

12

Artesian Boke No. 80: Section 37, Block XI, Thames — continued.

"as* m - -309 45 ft. pumice ssaud. 312 3 ft. rotten timber. 320 8 ft. pumice sand. 323 3 ft. rotten timber. 331 8 ft. pumice sand. 334 3 ft. clay. 338 4 ft. rotten timber.

Depth in . >. ■, Feet. ■ Uuti -- l "- -344 6 ft. clay. 34C 2 ft. sand. 352 G ft. clay. 366 14 ft. sand. 377 11 ft. clay. 378 1 ft. shingle.

Total depth, 378 ft. Flow, 96,000 gallons per day. Artesian Bore No. 81 : Section 11, Block XI, Thames. (Mr. Clevely.)

33 33 ft. clay. 36 3 ft. rotten timber. 66 30 ft. clay. 69 3 ft. rotten timber. 75 6 ft. sand. 79 4 ft. rotten timber. 89 10 ft. sand. 95 6 ft. clay. 106 lift. sand. 112 6 ft. clay. 114 2 ft. rotten timber. 154 40 ft. drift sand. 157 3 ft. shingle. 166 9 ft. clay. 173 7 ft. sand. 186 13 ft. clay. 190 4 ft. sand. 210 20 ft. shingle. 213 3 ft. rotten timber. 227 14 ft. pumice sand. 229 2 ft. rotten timber.

"ft* Dutails - -232 3 ft. pumice sand. 247 15 ft. clay. 248 1 ft. sand. 252 4 ft. rotten timber. 258 6 ft. pumice sand. 261 3 ft. clay. 267 6 ft. sand. 285 18 ft. white clay. 300 15 ft. pumice sand. 303 3 ft.' rotten timber. 332 29 ft. pumice sand. 334 2 ft. clay. 352 18 ft. pumice sand. 357 5 ft. rotten timber. 366 9 ft. pumice sand. 368 2 ft. rotten timber. 417 49 ft. pumice sand. 420 3 ft. clay. 430 10 ft. pumice sand. 434 4 ft. clay. 448 14 ft. drift sand.

Total depth, 448 ft. No flow. Artesian Boee No. 82 : Section 33, Block XI, Thames. (Mb. Cabbol.)

Depth in Dot ails Feet. Detail.. 47 47 ft, clay. 50 3 ft. rotten timber. 58 8 ft. sand. 65 7 ft. clay. 74 9 ft. drift sand. 80 6 ft. rotten timber. 89 9 ft. sand. 95 6 ft. rotten timber. 102 7 ft. sand. 108 6 ft, rotten timber. 118 10 ft. sand. 123 5 ft. rotten timber. 142 19 ft. pumice sand. 144 2 ft. rotten timber. 149 5 ft. pumice sand. 154 ' 5 ft. rotten timber. 164 10 ft. pumice sand. 168 4 ft. rotten timber. 174 6 ft. pumice sand. 176 2 ft. clay. 179 3 ft. sand. 191 12 ft. rotten timber. 196 5 ft. pumice sand. 202 6 ft. clay. 207 5 ft. pumice sand. 209 2 ft. rotten timber. 230 21 ft. pumice sand. 233 3 ft. clay. 253 20 ft. pumice sand. 260 7 ft. rotten timber.

Depth in ~. •, Feet. Details - I 266 6 ft. pumice sand. 268 2 ft. clay. 271 3 ft. hard sand. 273 2 ft. clay. 279 6 ft. pumice sand. 280 1 ft. rock. 287 7 ft. rotten timber. 297 10 ft. pumice sand. 300 3 ft. rotten timber. 339 39 ft. pumice sand. 341 2 ft. rotten timber. 344 3 ft. pumice sand. 349 5 ft. rotten timber. 358 9 ft. pumice sand. 363 5 ft. rotten timber. 386 23 ft. hard sand. 389 3 ft. rotten timber. 398 9 ft. pumice sand. 401 3 ft. rotten timber. 411 10 ft. pumice sand. 413 2 ft. rotten timber. 418 5 ft. clay. 423 5 ft. rotten timber. 429 6" ft. clay. 431 2 ft. sand. 433 2 ft. rotten timber. 438 5 ft. sand. 463 25 ft. clay. 469 6 ft. sand. 476 7 ft. rock.

Total depth, 476 ft. No flow.

Approximate Cost of Paper.— Preparation, not given ; printing 1,300 copies), including plan and illustrations, £37 10s.

Authority : John Mackay, Government Printer, Wellington.—l9l4.

Price 9d.\

This report text was automatically generated and may include errors. View the full page to see report in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/parliamentary/AJHR1914-I.2.1.4.18

Bibliographic details

DRAINAGE OPERATIONS IN HAURAKI PLAINS: REPORT FOR THE YEAR ENDED 31st MARCH, 1914; TOGETHER WITH STATEMENT OF ACCOUNTS., Appendix to the Journals of the House of Representatives, 1914 Session I, C-08

Word Count
8,438

DRAINAGE OPERATIONS IN HAURAKI PLAINS: REPORT FOR THE YEAR ENDED 31st MARCH, 1914; TOGETHER WITH STATEMENT OF ACCOUNTS. Appendix to the Journals of the House of Representatives, 1914 Session I, C-08

DRAINAGE OPERATIONS IN HAURAKI PLAINS: REPORT FOR THE YEAR ENDED 31st MARCH, 1914; TOGETHER WITH STATEMENT OF ACCOUNTS. Appendix to the Journals of the House of Representatives, 1914 Session I, C-08

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert