C—B

1910. NEW ZEALAND.

DRAINAGE OPERATIONS IN HAURAKI PLAINS: REPORT FOR THE YEAR ENDED 31st MARCH, 1910, TOGETHER WITH STATEMENT OF ACCOUNTS.

Presented to both Houses of the General Assembly pursuant to Section 10 of the Hauraki Plums Act, 1908. "IB,— Department of Lands, Wellington, 2nd May, 1910. 1 have the honour to attach herewith a report upon the drainage operations carried nut foTthe past year under the provisions of the Hauraki Plains Act, 1908. I have, &c. Wm. C. Kensington, Tin-Right Hon. Sir Joseph G. Ward, P.C., K.C.M.G., Under-Secretary for Lands. Minister of Lands.

REPORT. The attached report by the District Surveyor, Mr. J. B. Thompson, gives a, full and detailed account of the excellent progress made during the past financial year. It has been demonstrated by the opera tions for the past year that for successive years it will be possible to open areas of land for profitable settlement. The proposed operations foreshadowed in last year's report have I een vigorously prosecuted, the result being that some 17,500 acres of land have been opened for selection under the provisions of the Land Act, 1908. This includes the areas absorbed by reserves, roads, and drains, leaving 16,881 acres available for actual settlement. It is anticipated that another 12,000 acres will be ready for opening for selection during the ensuing spring and autumn. In order to make the Priestman dredges work more economically, new steel chutes have been erected on one of them : this will enable the spoil to be delivered automatically on each side of the dredge without loss of time and labour, a great improvement on the wooden structure formerly in use. and which was winked independently of the dredge. .Messrs. Price Bros., of the Thames, made a capital job of the new automatic steel chutes in question. The other dredge will be treated in the same manner. It is proposed during the coming year to take in hand the snagging of the upper portions of the Waitoa and Piako Rivers, and operations will probably be commenced early in October. Theclearing ofjjthese rivers will undoubtedly allow the Hood-waters to run away more quickly than at present. Drainage-works are also being undertaken in connection with an area of Crown land within the sphere of the operations of the Waitoa Drainage Hoard. This will not only benefit the Crown land. but will give an outlet for the water discharged from the drains cut by the Board. Another undertaking of considerable magnitude will be a scheme for draining the area of aboul 10,000 acres lying south of Kerepeehi and on the eastern side of the Piako River. This area is subject to inundations by the overflowing of the Waihoti River during Hood-time. The cause of the overflow is owing to the fact thai the Waihou River, winch carries a strong current for some fourteen or fifteen miles below Te Aroha. and runs a fairly straight course, is suddenly diverted to the eastward just beloy the flax-mills erected on the Waihou West No. 3 Block, and. not being able 1o find a vent foi its Hood waters quickly enough, overflows to the westward, causing a large volume of water to find its way into the A wait i Stream and oyer the Ciown land to the south-west. This flood-water, together with the winter floods in the Waitoa and Piako, submerge a considerable area of Crown and Native lands. The remedy appears to be cither by erecting many miles of stop-banks or possil.lv cutting a canal across the bends of the Waihou from the Max-mills to Thorp's Opukeko bend,

a—B

2

I am glad to place on record the praiseworthy efforts of all classes of officers and men to give effect to the Government's policy of opening the Hauraki Plains area for settlement as quickly as possible consistent with safety. Mr. J. B. Thompson has shown an intelligenl interest in the whole scheme, and has been most indefatigable in givingeffecf to it. Be has had the able assistance <>l Mr. George Purchas in carrying OUI the engineering details. In future it is intended, as being a more economical procedure, to keep the control of the whole operations under the Districl Surveyor, Mr. J. B. Thompson, Mr. Purchas being transferred to the sfafV of the Chief Surveyor, Auckland. Statement ok Accounts (as required by Section 10 of the Hauraki Plains Act, 1908) for the Year ended 31st March, 1910. Receipts. i Expenditure. 1909 £ s. d. 1910. t 8 - «• April 1. To Balance —Cash in Public Ac- Mar. 81. By Expenditure— count 327 14 6' Salaries.. .. .. .'7B I;. 0 mii) Travelling allowances and Mar. 31. To Advances from Loans to expenses, oamp allowances. Local Bodies' account, and general expenses oi under clause 4of the Han- administration.. .. mi ih - raid Plains Act, 1908 .. 19,000 0 o Purchase ami equipment Advances made by the New of dredges and launches, Zealand State-guaranteed maintenance and working- _ Advances Office .. 10,000 0 0 expenses .. .. .. v Buildings, erection and maintenance of .. 363 610 Cattle, purchase of .. 1,129 16 fi Drainage - works : Clearing channels, building stop - banks, tramways, and all expenses incidental thereto 15,703 2 8 22,235 2 11 Balance—Cash in Public Account .. .. .. 5,387 6 1 Advances in hands of officers of the ■Government .. .. 1,705 5 6 7,092 11 7 £29,327 14 6 £29^887146 Loan Account. 1910 £ a. d. 1909. t »■ d. Mar. 31. To Balance 42,108 19 9 April 1. By Balance due Loans to Local Bodies Acoount .. 12,125 211 „ 16. Advance from Loans to Local Bodies' Account, under clause 4 of the Hauraki Plains Act, 1908 .. 1,000 0 0 May 7. Ditto .. .. 5,000 0 0 July 6 5,000 0 0 Sep. 20. „ 1,000 0 0 Oct. 10 2,000 0 0 Nov. 16. 5,000 0 ») 1910. Interest on above to 31st March, 191(1 .. 983 L 6 10 Mar. 21. Advance made by New Zealand State-guaranteed Advances (Hficc . . .. 5,000 0 0 „ 81. Ditto 5,000 0 0 £42,108 19~9 £42.108 19 9

REPORT UPON HAURAKI PLAINS DRAINAGE OPERATIONS FOR TEAR ENDED 31st MARCH, 1910, BY THE DISTRICT SURVEYOR IN CHARGE. SIR _ Thames, 25th April, 1910. In this my first annual report since taking control of drainage and survey operations, I would briefly state that on Mr. William C. Breakell, C.E., retiring from the service on the 30th September, 1909. I was appointed as District Surveyor in Charge of Drainage-works and Surveys, and, working under your instructions, have controlled same as from the Ist October, 1909. Mr. G. H. Purchas has been associated with me us Engineer in Charge of Drainage-works as from the same date. I have to report that the various operations curried out during the past year have been very sue ccssful both as regards drainage and survey branches. Many other works of an experimental nature have also been undertaken, and in the great majority of cases have been entirely successful. There has been sufficient work done to date to clearly demonstrate the fact that the expenditure so far undertaken has been more than justified ; that the ultimate successful settlement of the whole

C-8.

of the lands contained within the Hauraki Plains is assured, and that this area will in the future carry a very large population. Naturally it will be some years before the whole area is brought in, for the reason that not only have we to cope with our own waters, but have also to provide for the waters being sent down the Piako and Waitoa Rivers by Drainage Hoards away to the south of the Crown Lands. Anotherpoinl to betaken into consideration is the silting up of the Waihou River. It is very evident thai when 11ns river is in flood a large volume of water finds its way across country to the Piako River, and will continue to do so until protective works are built, or the silting question is successfully solved. It will be necessary to build continuous stop-banks on both banks of the Piako River, at least as far south as t lie juncl ion of that river with the Waitoa River ; and I propose that this shall be done — when the time arrives by the dredges widening and deepening the river. The spoil will be used to build the stop-banks. This is tlie most economical way to deal with both matters, as the sectional area ol t lie river will l.c increased, and in Hood-time the waters will be confined between the stop-banks. As the work of snagging and clearing out the upper reaches ol t be Piako and Waitoa Rivers proceeds, a larger volume of water must come down, but it will be disposed of more rapidly. The completion of the Maukoro Waitakaruru Canal and Puhanga Canal will be the main factors in taking the overflows in flood season, and will greatly supplement the above scheme of stop-banks, &c. Dredges. Both dredges have been employed throughout the past year in cutting practically a new entrance from the Hauraki Gulf to the northern mouth of the Maukoro-Waitakaruru Canal. The old channel was extremely tortuous and quite unsuitable for navigation, and the new channel has been of great benefit in every way. Some dredging was done at the south end of this canal, but I did not consider it advisable to continue the work, as it created rather a cul de sac, and tended to give a lead for the flood-waters on to the peat country. The mouth of the Awaiti Stream was also deepened, ami many silt-deposits removed. Nf w steel chutes are now being erected on dredge No. 2, and I feel certain they will prove entirely successful in getting rid of the spoil. I anticipate a large saving in this connection, as the chutes, will be used to build stop banks and also roads along the canals. The new dredge-buckets, which will arrive very shortly, will be of great service. Although their capacity is one-third less than those now in use. yet more lifts will he made per diem. There will also be far less wcar-and-tear on the engines, as the united weights of ihe new bucket and spoil will be very much lighter than before ; and a corresponding gain will be made through less suction being experienced. Maukoro-Waitakaruru Canal. The above canal, as shown on the accompanying plan, litis now reached another stage. Some 80 chains of channel leading to its northern end had to be dredged before the dredge could get to work at the canal-mouth. There has now been dredged some 50 chains in length by 40 ft. in width to a depth at low water of about 4 ft. Beyond this for a distance of 105 chains the canal-route has been stripped to its lull width of the peat lying on the alluvial deposit. The average depth of stripping is about 5 ft., and the material was sent out to sea by sluicing. The spoil dredged up is being used to form roadways on cither side of the canal. The adjacent lands have been great Iy benefited, and flax is coming on well. Some little work was done at the south end ; but I did not consider it advisable to go on with it, more especially as a dredge was required at the Puhanga Canal. A dam will shortly be built so as to lift the dredge to a higher level, and thus save depth of cutting. Puhanga Canal. Tenders are about to be invited for the cutting of this canal as an overflow only. The formation will be 1 ft. below high-water mark, and the width at the bottom 10 ft. by an average depth of 6 ft. I am of opinion that it will probably prove unneccessary to further deepen this canal, as the proposed cross-section should prove sufficienl to carry off the flood-waters, and there is little doubt that in time the scour will materially deepen it. Dredge No. 2 will, however, dredge out some 5 chains of the canal at the northern end, so as to give the water a lead into same, and the mouth will be bell-shaped. It is not desirable to make this canal altogether navigable, as in the dry season the utility of the Piako River lor navigation would l.c greatly impaired. The same applies to ihe Maukoro-Waitakaruru Canal as regards a couple of miles at the southern end. Works performed. The following works have been done during the past year by means of co-operative contracts: New drains, 56-} miles ; road and track formation, 27i miles ; stop-banks, miles ; drains deepened and widened. 18i miles : fencing, 3| miles. With reference to the stop-banks, a great deal remains to be done in the way of raising and strengthening same so as to meet all possible contingencies of a severe flood. I anticipate having all the stop-banks adjoining the lands to be offered lor selection on L3th May next complete by the spring. General!} all roads and drains will be also greatly improved by that time. The following works were done by day-labour, the nature of same being rather disjointed, and not lending itself to the co-operative principle: Stripping .Maukoro■Waitakaruru Canal 40ft. wide, and making road bank 2 miles: combined stop-banks and drain widening, 1 1 miles; road-formation. 10 chains ; deepening and widening drains. 2| miles : felling and clearing of roads I chain wide. 7j miles ; sluicing and deepening drafti on Puhanga Canal, 30 chains ; fencing, 60 chains.

3

C—B.

4

Flood-gates and Flappers. four large double-door flood-gates and five double flappers have been placed in position, and o1 hers are now in course of construction. Iron docs have lately been used on same with excellent results. Wharves. Two wharves have been erected during the year, and another is mulct construction, improvements have been efie< ted to jetties already erected, and several service wharves will be buill later on, as il is more economical to provide wharfage at fairly close intervals than to construct roads. Bridges and Culverts. Eight small In-idges and six culverts have been elected, and the material is on the ground for as many more. Buildings. One cottage and three sectional lulls for workmen have been erected during the year, and one iron lint buill at Orchard, which will be used later on as a goods-shed. A cookhouse and drying-shed were also built at Waitakaruru, and revenue is being obtained from the former. A goods-shed was also erected ai Shortland Wharf, and general improvements effected on all existing^buildings. Private Telephone-line. In accordance with authority issued, some fourteen miles of telepone-line has been elected between Waitakaruru and Kerepeehi. The line is very substantial, all poles being of hear! of totara, and tapered. (ahles were also laid across the Piako River and the main canal, and light ning guards placed on same. Five telephone-stations are on the route, and all the works are In immediate touch by telephone with the Thames Office. The saving in time is very great, and the convenience to all concerned is of undoubted benefit. Water. Constant supplies of water were conveyed to the various works by the Department's steamer and launches, and. as a result, no sickness was experienced on the works through men drinking inferior water. Flax Areas. Son leven flax-areas were traversed and estimated during the past year, and on three ol these the cutting-rights were let. Unfortunately one area was badly burnl oul aboul one week aftei the letting of the same. The experimental flax areas planted eighteen months ago appear to be coming on well, and. generally speaking, the drainage operations have brougb.l much flax to light on areas where it was previously not seen at all. It is anticipated thai a fair revenue will be obtained from these sources. Artesian Bores: Arrangements were made with Messrs. Mounce and Sutcliffe to put down bores on the plains, and up to date two bores have been sunk to a depth of about 393 ft. each. The bote a 1 Pipiroa gave flows varying from 200 gallons to 34,500 gallons per day at different depths. The deepest flow showed a temperature of about 92° Fahr., and the water was of a soda nature. The proportion of sodium-bicar-bonate seemed to increase with the corresponding greater depths. The bore at Orchard is at a depth of 435 It., and the highest temperature found was 73 Fahr. There was apparently not such a large proportion of sodium-bicarbonate in this water. Generally speaking, the first flows found are quite palatable and lit for human consumption. However, as regards a watel-supply for stock, the artesian water found quite clears up this question, as stock are fond of the water, and do very well on it. Another bore is now about to be put down at Waitakaruru. I feel certain from the foregoing experiments that the artesian water is general, and 1 find that the flows will rise 12ft. above the surface of the ground. Another interesting result of the boring operations is thai the geological formation ol the plains is now made known, and shows that lor the first 25 ft. to •'>•"> fl. an alluvial deposif is found, and under that about 370 ft. of pumice sand (coarse and line), the whole resting on rhyofitic rock. Schedules giving the class of material met with during boring operations arc attached. As regards analyses of the various waters. I am waiting a little time to allow the botes to clear themselves somewhat, and will then forward samples duly labelled. There is also a gas issuing from Ihe bores which can be lit, and I intend to make a small experimental gas holder to see if i 1 is possible in gel any lighting results on a small scale. FIBES. Very little damage was done from this cause, as incipient Sres were taken in hand early, special instructions having been issued to all workmen to use everj effort to suppress same. Grass. Some lot.) acres has been sown in grass during past year, and the seed has come up very well, more especially the clovers. Another 100 acres of burnt country will he sown early. Kentucky blue-grass will also be sown on all stop-banks, as it is particularly suitable for this purpose.

5

C—B.

Cattle. The cattle purchased during the past year numbered some 550, consisting of steers, cows, and heifers. The first two lots were brought by a scow, bul the last herd was driven'joverland to the ground, the animals arriving in better condition than those sent via the sea. The stockmen, since taking charge of the cattle, from October last, have been assiduous in their duties, and no losses have been reported. 1 anticipate a substantial profit at the clearance sale of stock to be held on the l'.lth .May next. The,,presence of the cattle has been of great benefit to the land, having consolidated it greatly in many ways. Even if the. Department only realised the cost of stock, the experiment would have proved successful. 1 not only for the above reason, but also on account of the advertisement the property has obtained through the public seeing the excellent condition the cattle are now in. A more suitable object-lessonjjjcould not be found as to the ultimate value of the lands. Surveys. Three survey parties have been at work during the past year, and their energies have been fully taxed. Before any subdivisional scheme could be draw njjout, some 110 miles of existing drains and stop banks h.e.l to be traversed. I tun pleased to say thatjvery little of the existing drains was wasted. Up to the :51st .March. 1910, some 16,881 acres has been subdivided into 106 rural sections, 45 town ship sections, 30 suburban sections, and 19 reserves for various purposes. The plans are almost complete, and a tracing for photo-lithographic been made. In addition to the above, many of the Crow n awards were also cut out, and some ten miles of road on the eastern side of the Piako River was also laid out to give access to Turua, Paeroa, &c. Some of tiiese roads were taken under warrant, and others tinder the Public Works Act. LAMIi NOW READ'S Fill: SELECTION. All area of 16,398 acres is to I ffered about tic middle of May next, and the valuation of same totals £75,660. This is very satisfactory, and is a fairj f value in every instance. I am very sanguine of a record number of applications being received lor all sections, especially as the land is to be opened under the optional system. As you arc aware, all the works arc not complete, bul will be so by tin' spring. The fad ofthe Department maintaining and improving all drains,|jj&(\, for two years on the area to be opened should prove very saUsfai tory to the fortunate selectors. The country has also been greatly improved by the stock running on the same. The financial aspect proves thai your early expressed opinion has been fully justified, and that the Dominion his a very valuable asset in the Hauraki Plains. LAM) PROPOSED TO BE OPENED. Regarding laud that can be made available during the current financial year, 1 estimate the ana at. say, 12,0(X) acres, which will come in the following order : 4,300 acres on eastern side of Piako River ; 2,000 acres in the locality of Waikaka ; and 5,700 acres a.t extreme southern end of Hauraki Plains. Preparations aie in progress for the suitable dr.lining ol ihese areas, and a great deal of the work is now in hand. These areas are all good land, and should command keen competition. The firstmentioned area will be ready by late spring, and the others by early autumn. Of course, everything depends upon a good season being experienced for the drainage operations. Main Arterial Roads. The roads shown on the plan do not cover all those necessary in this direction, but I consider it better that such proposals should be shown from year to year, as many circumstances have to be taken into consideration in laying them off. Carriage of Stores and Timber. During the past year the Department purchased the s.s. " Hauraki.'' and this vessel has been steadily engaged carrying timber and all stores to the various works on the Hauraki Plains, from both Thames and Auckland. Three oil-launches are also engaged on the various works, and arc in active commission every day on the rivers and streams. Principal Works proposed. The principal works to be carried out during the current financial year are as follows : — 1. The completion of stop-banks, Hood gates, culverts, bridges, wharves, and roads immediately connected with the area to be opened next May. 2. The continuance of dredging operations on Maukoro-Waitakaruru Canal, this wotl< being the key to the whole scheme. 3. The construction of overflow on Puhanga Canal, which work affects the ultimate success of drainage-works. 1. The formation of roads between Kerepeehi and Turua to open up further Crown lands. 5. The const met ion of mil falls through ( 'tow n lands to enable the Waitoa Drainage Hoard to carry out their drainage proposals. This work will also open upjjour own country loi settli ment. 6. The furt her construction of stop-banks along the Piako River, together with necessary wharves, &c.

6

C.-8.

7. The construction of outfall through Te Whanake Blocks. 8. The snagging and clearing of upper reaches of Waitoa and Piako Rivers, such work to commence In October next. 9. The construction of the necessary drains to bring land into a fil condition for settlement. There are also many mi : works'to be carried out. which, although in themselves of a small character, vet are very necessary to the successful issue of all general operations. General. The accompanying plan shows in distinct colours, ic. the presenl state ~l operations, and the reference-notes thereon clearly distinguish the various classes of drainage works, lands now ready tor selection, and future proposals in this connection. In conclusion. I have every confidence in stating thai the success ol ihe drainage scheme is now assured, and that ultimately every acre ofthe Hauraki Plains will be rendered productive. 1 have, &c, J. 1?. Thompson, Disirict Surveyor in Charge of Hauraki Plains Works and Surveys. The I'lider-Seci'etan lor bands. Wellington. \l! TESIAN BORES. PIPIROA. Depth in Depth in Feet. Feet - , . oto 30. 30 ft. blue and grey mud with shell. 256. 20 ft. of soft grey mud. 36. 6 ft. of fine sand. 268. 12 ft. of pumice and clay. 76. 10 ft. of soft pumice sand. 278. 10 ft. of clay (chalky). 79. 3 ft. of blue mud. 285. Plow of 14,400 gallons per day of soda--159. 80 ft. of pumice-and-mud mixture. water. 179. 20 ft. of rough pumice and sand. 301. 23 ft. of clay (chalky). 189. 10 ft. of blue clay. 304. 3 ft. of sand. 191. Flow of 200 gallons per day of soda- .".16. 12 It. of pumice water. 356. lo ft. ol white clay. 107. 8 ft. of hard fine sand. 388. 32 ft. of white clay and pumice. 202. 5 ft. of sand. 383. Blow of 34,500 gallons per day ol hot 206. 4 ft. of peaty swamp. soda-water, 89° to 93 Fahr. 220. 14 ft. of blue mud. 391. 3 ft. of hardjsandstone^rock. 236. 16 ft. of sand. Orchard. ii ~, 5, sft. shell and mud. 250. 30ft. sand (How. 3,000 gallons per U. 6 ft. blue mini. day). 21. 10 ft. hard sand. 252. 2 It. mud. 2:!. 2 ft. peaty mud. 266. lift. sand. 2(i. 3 ft. rough pumice. 272. 6 ft. mud (How. 2,000 gallons per 16. 20 ft. slaty-coloured mud. day). C,:!. 17 ft. sandy pumice. 284. 12 ft. sand. 103. 40 ft. sandy pumice. 291. 7 ft. clay. 10.-). 2 ft. blue mud. 300. 9 ft- sand (flow. 1,000 gallons per 108. 3 ft. hard sand. day). 111. 3ft. soft mud. 315. 15 ft. mud. 112. 1 ft. peaty mini. 335. 20 ft. sand. 117. 5 ft. pumice and clay. 338. 3 ft. slaty clay. 137. 20 ft. sand (flow. 2,000 gallons p.-r 340. 2 ft. sand (pumice). r] av ), "354. II ft. sand. 167. 30ft. sand. 357 3 ft. peaty mud. L 69. 2 ft. peaty mud. 368. II ft. sand. 170. I ft, sand. 388. 20 ft. sandy pumice. 175. 5 ft. blue mud. 104. Hi ft. line sand. 195. 20 ft. blue mud. WB. 4 ft. peaty mud. 206. lift. sand. 123. 15 ft. rough shingle.^ 208. 2 ft. mud. |:!f) - '- 11 - rl '' v ( flow > 21.000 gallons per 218. 10 ft. hard sand. day). 220. 2 ft. mud. Approximate Gout o) Paper.— Preparation, not kivbu ; printing (1.60U copies, Intituling map and illustrations), £10 10s. By Authority : Johs Mackay, Government Printer. Wellington. 1910. Price (id.

C.-8,

BIRD'S-EYE VIEW OF DRINAGE-WORKS

a—a

One of the Drains.

Puhanga Canal.

C.—B.

Stripping and Clearing Drains.

Stripping and Clearing Drains.

a—B

Stripping and Clearing Drains.

One of the Drains.

C—B

PLAN SHOWING LANDS DEALT WITH UNDER THE PROVISIONS OF THE HAURAKI PLAINS ACT, 1908.

This report text was automatically generated and may include errors. View the full page to see report in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/parliamentary/AJHR1910-I.2.1.4.21

Bibliographic details

DRAINAGE OPERATIONS IN HAURAKI PLAINS: REPORT FOR THE YEAR ENDED 31st MARCH, 1910, TOGETHER WITH STATEMENT OF ACCOUNTS., Appendix to the Journals of the House of Representatives, 1910 Session I, C-08

Word Count
4,484

DRAINAGE OPERATIONS IN HAURAKI PLAINS: REPORT FOR THE YEAR ENDED 31st MARCH, 1910, TOGETHER WITH STATEMENT OF ACCOUNTS. Appendix to the Journals of the House of Representatives, 1910 Session I, C-08

DRAINAGE OPERATIONS IN HAURAKI PLAINS: REPORT FOR THE YEAR ENDED 31st MARCH, 1910, TOGETHER WITH STATEMENT OF ACCOUNTS. Appendix to the Journals of the House of Representatives, 1910 Session I, C-08

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert