WELLINGTON, Last Night.
The first annual meeting of the Wellington-Manawatu Railway Company was held to-day. In the report the directors congratulate the shareholders on the satisfactory position of affairs. The contract is let for the construction to Wellington-Longburn Junction, amount ing to, £72,963. Several contracts are finished, 1 and others arc in progress. ' The survey of the line had advanced considerbly, so that in two or three months tenders may be called for 28 miles. This will make 35 miles in course of, construction. The report was adqp^ed.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WT18830405.2.11.2
Bibliographic details
Waikato Times, Volume XX, Issue 1677, 5 April 1883, Page 2
Word Count
88WELLINGTON, Last Night. Waikato Times, Volume XX, Issue 1677, 5 April 1883, Page 2
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.