SEARCH FOR OIL
TARANAKI OUTFIELDS. Report issued for week ended Oct. 17th.—Waitangi No. 2 well: Drilled to 2172 feet in hard limey shale. Some difficulty in maintaining hole at full diameter below 2000 feet. Have pumped cement into the formation; “ now waiting for same to set.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WDT19311022.2.24
Bibliographic details
Wairarapa Daily Times, 22 October 1931, Page 4
Word Count
46SEARCH FOR OIL Wairarapa Daily Times, 22 October 1931, Page 4
Using This Item
National Media Ltd is the copyright owner for the Wairarapa Daily Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of National Media Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.