Thank you for correcting the text in this article. Your corrections improve Papers Past searches for everyone. See the latest corrections.

This article contains searchable text which was automatically generated and may contain errors. Join the community and correct any errors you spot to help us improve Papers Past.

Article image
Article image
Article image
Article image
Article image
Article image

ENGINEER'S REPORT.

The engineer reported ,inter alia, as follows: — Te Whiti Riding. The stone work required for the protection to the pier of the Wangaehu bridge has been carried out this month. Metal repairs are being made to Cooper's roiul ou the Te Ore Ore estate. Rangitumau Riding. Weather conditions have been unfavourable to carrying out tin; metal repairs of contract let on Dorset's road, there being a considerable length of unmetulled. r.oad over which it is necessary to houl the 7ne:al. 1 think tin Avork will have to be held over until next spring.

Opaki-Rangitumau Road, contract No. ::!;">, delivering fifiO cubic yards of metal for repairs, unlet at last meeting: I have been unable to get the work under any satisfactory conditions, and 1 would therefore advise that the main contract be abandoned for the season; that urgent patches be dealt with as opportunity offers. Wainuioru Riding. Masterton-Waimata Road, contract No. .">ol2, delivering 1775 cubic yards of metal for repairs: 16158 cubic yards have been delivered by i>. Hogan, making a total length of 241)1 cubic yards, and the total cost, including breaking 80S cubic yards of rock, £7'.)~>. Alfredton Riding. Alfredton-Weber Road, contract Mo. i.OH, delivering 1040 cubic yards of metal: The contractor has encountered extremely wet weather, and is near the end of his work. Contract No. .'iO4, delivering 700 cubic yards, has been completed with in cubic yards extra. Waitowhiti to Tiraumea section: I. have arranged" for the delivery of about (.50 cubic yards on the weaker portions of the above length. Contract No. .'{os (L. and Gt.), SO chains of metalling: The condition of the road was unfavourable for heavy carting, and I stayed work for the season. Castle Hill Road, contract No. :Sl4, metal repairs: Started on Ist inst., but little progress lias been made owing to the state of the weather.

Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/WDT19140513.2.3.2

Bibliographic details

Wairarapa Daily Times, Volume LXVI, Issue 11976, 13 May 1914, Page 2

Word Count
308

ENGINEER'S REPORT. Wairarapa Daily Times, Volume LXVI, Issue 11976, 13 May 1914, Page 2

ENGINEER'S REPORT. Wairarapa Daily Times, Volume LXVI, Issue 11976, 13 May 1914, Page 2

Help

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert