New Pukeroa Bridge
Construction work on a new bridg# at Pukeroa, near Taihape, had been completed, reported the engineer, Mr H. Murray Reid, at the monthly meeting of the Rangitikei County Council yesterday. “The approaches are being constructed and when completed the new bridge can be used by all traffic,” the engineer added. “The contractor will dismantle the old timber bridge in the near future.”
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WC19501110.2.17
Bibliographic details
Wanganui Chronicle, 10 November 1950, Page 3
Word Count
65New Pukeroa Bridge Wanganui Chronicle, 10 November 1950, Page 3
Using This Item
NZME is the copyright owner for the Wanganui Chronicle. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.