CRANE DRIVERS TO RESUME FULL WORK
(P.A.) Wellington, April 11. Full-time work will be resumed on the waterfront by the Wellington crane drivers to-morrow. This was announced following a meeting between the acting Minister of Labour, Mr. O’Brien, and representatives of the Wellington Harbour Board, and the Wellington waterfront unions. A tribunal is to be s°t up under the Strike and Lockout Regulations, to »o into the metier in disnute between the unions and the board.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WC19460412.2.49
Bibliographic details
Wanganui Chronicle, Volume 90, Issue 85, 12 April 1946, Page 5
Word Count
76CRANE DRIVERS TO RESUME FULL WORK Wanganui Chronicle, Volume 90, Issue 85, 12 April 1946, Page 5
Using This Item
NZME is the copyright owner for the Wanganui Chronicle. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.