The contractors, Messrs Tait and Hutchings, of Frankton, for the new block of eight shops on the corner of Alexandra and Arawata streets have commenced work and the foundations are now being pegged out. The buildings will have a floor space of over 6000 square feet, and will be completed in about six months time. The shop fronts will presen't a very fine appearance, and are to be in either tiles or granite.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WAIPO19130401.2.25
Bibliographic details
Waipa Post, Volume IV, Issue 200, 1 April 1913, Page 3
Word Count
73Untitled Waipa Post, Volume IV, Issue 200, 1 April 1913, Page 3
Using This Item
NZME is the copyright owner for the Waipa Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.