DUKE STREET WIDENING
FULL WTDTH RECONSTRUCTION
ALTERATION TO PLANS
Referring, to the widening of Duke Street in his report to Wednesday night’s meeting of the Cambridge Borough Council, the engineer, Mr Neville Sanderson, stated that reconstruction had been deferred to avoid excessive disruption of traffic while awaiting the commencement of the sealing season. Main Highways Board’s restrictions in this direction applied from May 1 to September 30. The engineer added that application had been made for a variation of the Main Highways Board Authority, to substitute full width reconstruction and sealing for the original proposal, embracing widening half width. Authority had now been granted subject to the addition of light plant mix surfacing from kerb to kerb. ; The approximate increase in the cost would be £350.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WAIKIN19470919.2.14
Bibliographic details
Waikato Independent, Volume XLIV, Issue 6104, 19 September 1947, Page 4
Word Count
126DUKE STREET WIDENING Waikato Independent, Volume XLIV, Issue 6104, 19 September 1947, Page 4
Using This Item
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.