The directors of the Arsenal Football Club have commissioned two London architects to draw up a scheme for large extensions proposed at the Highbury ground. Huge new stands, capable of increasing tlie capacity of the ground to 156,006 spectators, are to be built on a plan which will tend to make the o-round one of the finest in tlie country. The cost will be about £86,000..
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TDN19310919.2.120.7
Bibliographic details
Taranaki Daily News, 19 September 1931, Page 12
Word Count
66Untitled Taranaki Daily News, 19 September 1931, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Taranaki Daily News. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.