CHANGE-OVER IN NORTH ISLAND
HORAHORA TO BE “SACRIFICED” (P.A.) WELLINGTON, Sept. 25. The chief electrical engineer, Mr F. T. M. Kissel, told the Electric Power Authorities’ Conference to-day that, when the new power station at KaraEiro comes into operation, there will e no margin of power to tide over the interval between the closing down of Horahora and the starting of Karapiro. Consequently, the Horahora station, which will be “ drowned,” will have to be sacrificed with all the plant except the most easily removable equipment.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/ODT19450926.2.98
Bibliographic details
Otago Daily Times, Issue 25958, 26 September 1945, Page 6
Word Count
85CHANGE-OVER IN NORTH ISLAND Otago Daily Times, Issue 25958, 26 September 1945, Page 6
Using This Item
Allied Press Ltd is the copyright owner for the Otago Daily Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.