PORT ELLIOT WRECK
SALVAGE WORK SUSPENDED. Per Press Association. GISBORNE, January 24. Salvage operations at the Port Elliot have been suspended since Sunday, owing to the weather. The eea has been moderate to heavy, and has prevented the lightering of the cargo, though it is not affecting the stranded vessel.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZTIM19240125.2.43
Bibliographic details
New Zealand Times, Volume LI, Issue 11736, 25 January 1924, Page 6
Word Count
50PORT ELLIOT WRECK New Zealand Times, Volume LI, Issue 11736, 25 January 1924, Page 6
Using This Item
Stuff Ltd is the copyright owner for the New Zealand Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.