TRAFFIC OVER BRIDGE
ILIMINATING CROSSING MAMAKU HILL DEVIATION [by telegraph—owx correspondent] EOTORUA, Monday Good progress is being made with the construction of the deviation leading to the site of the new overbridge which will eliminate the level-crossing at Tarukenga, on the Mamaku Hill, about 10 miles from Rotorua. The contractor has also started the construction of the bridge. ■: It is unlikely that the new route will bo open in time for the Christmas holiday traffic. The surface of the -new filling will, however, require to be consolidated bv traffic for some time before it can be sealed.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZH19361117.2.104
Bibliographic details
New Zealand Herald, Volume LXXIII, Issue 22578, 17 November 1936, Page 10
Word Count
97TRAFFIC OVER BRIDGE New Zealand Herald, Volume LXXIII, Issue 22578, 17 November 1936, Page 10
Using This Item
NZME is the copyright owner for the New Zealand Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries and NZME.