Quarry Road Bridge.
Strudt jrc Now Completed. The Quarry Road bridge, which, like others over the Whapgatane spillway, had to be lengthened owing to the extra width of the cut made by the dredges, has been completed, and the finished structure reflects credit on the department and on the cons’ruction gang which carried o it the work in charge of Mr. H Foley. Solidly-built and permanent looking, the new bridge his a total length of 121 feet and a width of 12 feet, with handrails for the full length, and is erected on hardwood piles with puriri decking.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NORAG19291106.2.6
Bibliographic details
Northland Age, Volume 1, Issue 47, 6 November 1929, Page 2
Word Count
98Quarry Road Bridge. Northland Age, Volume 1, Issue 47, 6 November 1929, Page 2
Using This Item
NZME is the copyright owner for the Northland Age. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.