Arapuni Operations Restart To-day
PLANS TOR THOROUGH INSPECTION Per Press Association. HAMILTON, Last Night. It is understood that operations on the Arapuni spillway bed between the dam and tho weir will be commenced on Monday in anticipation of the arrival of Professor G. P. Hornsell, the Swedish expert engaged by the Government to report. Indications show that it is probable tho bed will be cleaned for a thorough inspection of the whole channel and that further shafts will be sunk in the neighbourhood of the cracks so as to try and discover tho causes of tho leakages.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/MT19300804.2.27
Bibliographic details
Manawatu Times, Volume LV, Issue 7295, 4 August 1930, Page 6
Word Count
97Arapuni Operations Restart To-day Manawatu Times, Volume LV, Issue 7295, 4 August 1930, Page 6
Using This Item
Stuff Ltd is the copyright owner for the Manawatu Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.