SPANISH SIDE OF STRAITS TUNNEL
Selected by Experts WILL BEiLONG BEFORE SCHEME CAN PAY WAY LINK WITH AFRICAN LINES. Times Cable. Received Tuesday, 2 a.m. LONDON, Jan. 14. The Times Madrid correspondent states that an expert commission oT engineers, geologists and hydrographert has selected a point west of Tarifa from winch to begin work on the Straits of Gibraltar tunnel. It will select the point on the Africa* shore in February. Technical problems are not considered to offer great difficulties. The tunnel would be only two miles longer than the Simplon tunnel, but economically, the enterprise is regarded as hazardous, as the traffic it hardly expected to prove remunerative until the tunnel is connected with the African railways and this is unlikely to happen for many years.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/MT19290115.2.33
Bibliographic details
Manawatu Times, Volume LIV, Issue 6811, 15 January 1929, Page 6
Word Count
127SPANISH SIDE OF STRAITS TUNNEL Manawatu Times, Volume LIV, Issue 6811, 15 January 1929, Page 6
Using This Item
Stuff Ltd is the copyright owner for the Manawatu Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.