AERODROME BUILDINGS.
WORK TO START IN NOVEMBER
According to present arrangements, the building of the large new hangar, the control buildings and other facilities for Union Airways, Ltd., at the Milson aerodrome is to begin in November, a “Standard” reporter was informed to-day. It is understood that the plans have received Government approval. Steel for the hangar has been ordered from England and is already on the water. Plans are now under way for general constructional activities.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/MS19350924.2.71
Bibliographic details
Manawatu Standard, Volume LV, Issue 254, 24 September 1935, Page 6
Word Count
77AERODROME BUILDINGS. Manawatu Standard, Volume LV, Issue 254, 24 September 1935, Page 6
Using This Item
Stuff Ltd is the copyright owner for the Manawatu Standard. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.