INKERMAN.
The mine manager r^pofijgior the Week level 80 feet. The contractors r «re cutting out the ground for the opening set. The shaft will be down the required depth in about a fortnight if tlie ground remains as good as it is at present. Soulli Lease. Prospecting is still going on but no change. Tenders for chamber and driving to the lode will be invited on Mon« uay, to close at end of the month.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/IT18910420.2.7.4
Bibliographic details
Inangahua Times, Volume XVI, Issue 20226, 20 April 1891, Page 2
Word Count
76INKERMAN. Inangahua Times, Volume XVI, Issue 20226, 20 April 1891, Page 2
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.