QUARRY OUTPUT
WORK AT MANGATARATA
1369 YARDS FOR THE MONTH
The output for the past month at the Mangatarata quarry was 1369 cubic yards of crushed, metal, reported the county engineer, Mr E. Hazledine Barber, to the August meeting of the Hauraki Plains County Council. The metal was distributed as follows: Highways and roads, 90'8 cubic yards; sales, 461 cubic yards; total, 1369 cubic yards.
“ quarry was closed down three days owing to the breaking of the crusher shaft in the drum crusher. With four months of the year gone the output is approximately one thousand cubic yards behind last year. Every endeavour will be made to make up this deficiency but it is very doubtful if this can be overtaken,” added the report.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/HPGAZ19470818.2.32
Bibliographic details
Hauraki Plains Gazette, Volume 56, Issue 32897, 18 August 1947, Page 7
Word Count
124QUARRY OUTPUT Hauraki Plains Gazette, Volume 56, Issue 32897, 18 August 1947, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Hauraki Plains Gazette. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.