A start is to be made very shortly bv the Hawke’s Bay County Council with the bitumen sealing of the roadway through the To Auto cutting. With tho dry weather that is ruling at the pre sent time this particular portion of tho main road is very dusty and also is not in very good condition because of tho amount of traffic which uses it. When it is tar sealed there will be an almost unbroken extent of bitumen or concrete roadway from Napier to past Waipukuraiu
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/HBTRIB19320126.2.63.2
Bibliographic details
Hawke's Bay Tribune, Volume XXII, Issue 36, 26 January 1932, Page 5
Word Count
87Page 5 Advertisements Column 2 Hawke's Bay Tribune, Volume XXII, Issue 36, 26 January 1932, Page 5
Using This Item
NZME is the copyright owner for the Hawke's Bay Tribune. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.