GOLDMINING
ALEXANDER MINES LIMITED. Gold returns for September are, Battery Department. 128 tons of Ore crushed for 72 ozs 3dwt. melted gold, valued at £560/-/-. Cyanide Department, this has not been cleaned up. Concentrates, in addition to the above, 6.5 tons were saved, containing 34.172 ozs. gold, valued at £270/-/-. The mine report for month of September states: Work has been confined to ore production above No. 6 Intermediate Level and north oi No. 2 Rise. The Intermediate Level stopes shows no change, except in the extreme south end. The lode here is gradually improving in size and now averages 2 feet in width. Stoping to the north of No. 2 Rise, the lode ranges from 1 to 4 feet and has improved in length,, the stoping length being now 66 feet. 133 tons sent to Battery.
MOUNT HUTT DREDGE LAUNCHED. The Mount Hutt Gold Dredge at Mai-Mai was successfully launched yesterday afternoon, and will commence operating in January. BLACKBALL CREEK. The Blackball Creek dredge return last week was 45 ounces from 120 hours.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/GRA19411007.2.16
Bibliographic details
Grey River Argus, 7 October 1941, Page 2
Word Count
174GOLDMINING Grey River Argus, 7 October 1941, Page 2
Using This Item
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.