MAINTENANCE WORK
FORTNIGHT’S SCHEDULE ANNUAL CLEAN-UP WEEK The principal road works in the town, agreed to by the Gisborne Borough Council last night on the recommendation of the works committee, were the maintenance of metal, gravel and bitumen surfaced roads and the continuation of No. 13 scheme works. The annual clean-up week was approved for the period commencing next Monday. A request from a property owner to drain stormwater from his property, the owner to supply the pipes and the council to bear the cost of installation, was declined. Confirmation was given to a recommendation from the finance committee that the offer of Mr. Bruetsch to surrender his borough leasehold be declined.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/GISH19401002.2.98
Bibliographic details
Gisborne Herald, Volume LXVII, Issue 20367, 2 October 1940, Page 7
Word Count
112MAINTENANCE WORK Gisborne Herald, Volume LXVII, Issue 20367, 2 October 1940, Page 7
Using This Item
The Gisborne Herald Company is the copyright owner for the Gisborne Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of the Gisborne Herald Company. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.