MAKING ROAD SEWER.
So good lias been the progress made in laying the sewer mams along Makino xoad to the railway station that the Borough Foreman, who lias had the work done on the day labour system, ivas able to report last night that it was almost completed. The t-remdh - was all out, and the pipes should be in position and jointed on Saturday evening. This means that the sewer should be in working order for Monday morning next.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/FS19111215.2.7.10
Bibliographic details
Feilding Star, Volume VI, Issue 1671, 15 December 1911, Page 2
Word Count
79MAKING ROAD SEWER. Feilding Star, Volume VI, Issue 1671, 15 December 1911, Page 2
Using This Item
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.