THE RAILWAYS.
The following telegram has been received from the Minister for Public Works : The plans for the section between Balclutba and Clinton are now ready, aud tenders will be called for within a fortnight. The time allowed to complete the contract is not to exceed twelve months. The Northern line is all under contract, excep; the Waikonaiti section, which the Government intend a shall be completed within the time specified for the completion of contracts now in course of construction on both, sides of it. The Government rccogaise the necessity of completing the section re(erred to, and will use every exertion to do so as above slated. In re interior railway communication, surveys have been made to the order of the Government, but the engineer’s report has not been yet received. _
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/ESD18770714.2.19
Bibliographic details
Evening Star, Issue 4485, 14 July 1877, Page 4
Word Count
132THE RAILWAYS. Evening Star, Issue 4485, 14 July 1877, Page 4
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.