MINE AND DREDGE
RETURNS AND REPORTS
Big River Gold Mines reports for the week ending February 8:—No. 5 level, north stope—Filling not yet completed, j No. 6 level, south '• bloek-»-Stone slightly' longer iand wider. Length 14ft, width 6ft; commenced to advance this level south. Shaft, sunk sft; total 107 ft. Sent to battery,-:31 tons of stone. MARTHA MINE. The following information has been cabled to the London office of the Martha Gold Mining Co. (Waihi), Ltd.: —No. 5 level, Martha lode—North ' branch: Comes south winze. At 150 ft in 800 ft west crosscut, sunk 45ft. Assay value to this depth is 17s a ton, width of vein about 18in. WHITE'S ELECTRIC. White's Electric return of gold won during the week ended February 8 was 360z of gold from 10,000 yards. NEMONA. Nemona Gold Dredging Company, Ltd., returns for the week ending February 9 were 230z for 132 hours and 5200 yards. NEW RIVER. The official return of gold won by New River dredge during the week ended February 8 was 270z from 7000 : ?'ards treated in 96 hours' dredging ime. ARGO. (By Tclegrraph—Press Association.) GREYMOUTH, February 10. The Argo Dredge return was 260z for 119 hours; 7000 yards of material were excavated.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19400212.2.110.3
Bibliographic details
Evening Post, Volume CXXIX, Issue 36, 12 February 1940, Page 10
Word Count
202MINE AND DREDGE Evening Post, Volume CXXIX, Issue 36, 12 February 1940, Page 10
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.