REXMANN MINES.
Rexmann Mines manager reports for the week ended September 3 that the grinding mill was erected and a template made of the chute to connect the stamper box. This will be constructed in steel. The penstock of the water race was placed in position and concreted in, also connected to the pipe line. The company's prospector located the reef at the head of Lanigan's Gully 200 feet north of his trenches. It is a fine body of stone.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19370907.2.147.13
Bibliographic details
Evening Post, Volume CXXIV, Issue 59, 7 September 1937, Page 14
Word Count
80REXMANN MINES. Evening Post, Volume CXXIV, Issue 59, 7 September 1937, Page 14
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.