ANTONIO'S HYDRAULIC.
Antonio's Hydraulic Elevating Company reports active mining operations should be in full swing in a month or five weeks. The water-race from the reservoir dam in Sawyer's Creek, to the claim, and the pressure pipe line to the elevator are completed. The water has been turned on and the old dredge paddock, where it is intended to commence mining operations, has been pumped out. The elevator, distributing boxes, hopper plates, and gold-saving tables are at the claim and the large storage dam in Sawyers Creek is nearing completion.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19360408.2.155.15
Bibliographic details
Evening Post, Volume CXXI, Issue 84, 8 April 1936, Page 14
Word Count
90ANTONIO'S HYDRAULIC. Evening Post, Volume CXXI, Issue 84, 8 April 1936, Page 14
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.