MINING REPORTS
BIG RIVER GOLD
Big River Gold Mines Ltd. gives the following official report on the repairs to the company's main shaft for the week ending January 23:—Shaft: From bearers up to the floor of No. 5 chamber has been timbered and packed and the opening out set and second chamber set stood and sides packed. Shaft timbering completed and centres in position as far up as cap of chamber set. Guides and centres that have been left out will now be put in as we work up to the ironbark bearers at the bottom of the caved ground. Also the permanent ladders and stagings will be fixed in position. When the ironbark bearers are reached, the straightening process will have to commence.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19360128.2.104.12
Bibliographic details
Evening Post, Volume CXXI, Issue 23, 28 January 1936, Page 12
Word Count
124MINING REPORTS Evening Post, Volume CXXI, Issue 23, 28 January 1936, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.