NEVIS DIESEL.
! The secretary of the Nevis Diesel Electric Dredging Co., Ltd., reports that the wash-up for the week ended May 11 was soz 15dwt. The dredge is now proceeding rapidly towards the ground proved by the bores, and is working through alluvial drift. Suitable casing for the boring plant has been received from the manufacturers, and boring is to be commenced right away. Up till now the plant has been operated by. hydro power, thus keeping cost down to a minimum. Preparations are being made for beaching the dredge at the end of nest week, to close down for the winter.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19340516.2.125.3
Bibliographic details
Evening Post, Volume CXVII, Issue 114, 16 May 1934, Page 12
Word Count
102NEVIS DIESEL. Evening Post, Volume CXVII, Issue 114, 16 May 1934, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.