WAITING FOR THE WEATHER
A good deal of preparation work has been done by the paving cvews in tha city and suburbs, and the mixing plants are ready for an immediate start, but nothing can be done under the present weather conditions. Tho first lengths to bo treated are Tory street, between Wakefleld and Vivian streets, Taranaki street between {Jhuznco and Buckle streets, a length of the Evans .Bay road south of the Patent Slip, a mile or so of the main road through the Hutt Valley, and a length near the Trotting Club's course. The Tory street and Taranaki street work will commence the 1925 paving loan scheme, and the other works mentioned under the Hutt road extension scheme. The two new mixing plants ordered- , are exuectfld about the end oi .October, --
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19250828.2.74
Bibliographic details
Evening Post, Volume CX, Issue 51, 28 August 1925, Page 8
Word Count
133WAITING FOR THE WEATHER Evening Post, Volume CX, Issue 51, 28 August 1925, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.