“UTTER NONSENSE”
RUMOURED TOTAL COST OF NORTHLAND TUNNEL
At'the meeting of the City Council last night, Councillor Semple asked the Mayor if he could inform him what was the total cost of the Northland tunnel and the wall which was to be built before the tunnel could be brought into service. It was suggested that the wall which would have to be built would cost from £50,000 to £60,000. Was there any truth In the statement that the wall would cost £50,000 or £60,000, in addition to the tunnel?
The Mayor: I can assure Councillor Semple that that is utter nonsense.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/DOM19280511.2.61
Bibliographic details
Dominion, Volume 21, Issue 188, 11 May 1928, Page 8
Word Count
101“UTTER NONSENSE” Dominion, Volume 21, Issue 188, 11 May 1928, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.