Repairs to Penrod
(N.Z. Pres.s Association > NEW PLYMOUTH. Faulty equipment on the Pen rod 74 rig has been repaired and tests are being made before drilling resumes on the Turi I well off the north Taranaki coast. Turi 1 has been drilled to a depth of 1322 ft. There was no drilling last week after discovery of a major leak in part of the equipment. It was the third delay at the site.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19750327.2.122
Bibliographic details
Press, Volume CXV, Issue 33803, 27 March 1975, Page 15
Word Count
73Repairs to Penrod Press, Volume CXV, Issue 33803, 27 March 1975, Page 15
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.