TIMETABLE PROPOSED
While favouring the provisional area scheme for North Canterbury brought down by the Local Government Commission, the Christchurch Drainage Board last evening said that a timetable should be proposed to the commission.
“Otherwise, uncertainty will render forward planning by the presently-constituted local authorities impossible and local body works will stagnate to the disadvantage of all,” the board said.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19720223.2.156
Bibliographic details
Press, Volume CXII, Issue 32848, 23 February 1972, Page 18
Word Count
60TIMETABLE PROPOSED Press, Volume CXII, Issue 32848, 23 February 1972, Page 18
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.