THE JOHN DAY DAM, which cost 450 million dollars, viewed from the Washington State side of the Columbia River. In the foreground is the navigation lock. The lake has been formed on the left of the mile-long dam, the biggest Army engineers have built.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19680424.2.39
Bibliographic details
Press, Volume CVIII, Issue 31662, 24 April 1968, Page 5
Word Count
44THE JOHN DAY DAM, which cost 450 million dollars, viewed from the Washington State side of the Columbia River. In the foreground is the navigation lock. The lake has been formed on the left of the mile-long dam, the biggest Army engineers have built. Press, Volume CVIII, Issue 31662, 24 April 1968, Page 5
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.