GAS MAIN TO PORT
Use Of Tunnel
Approved
I A gas main through the tunnel to provide a Lyttelton supply was agreed to in principle by the ChristchurchLyttelton Road Tunnel Authority yesterday, provided there were sufficient safeguards. The general manager (Mr L. H. Wilson) was asked to investigate a possible rental and the effect on insurance. The chief inspector of explosives wrote saying that if a suitably-engineered line was laid the proposal could be regarded as reasonable.
The Ministry of Works also said that provision of a gas line within the main exhaust duct would be a feasible and safe proposition, provided it was designed to proper standards and was properly fabricated, installed, and maintained.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19650527.2.17
Bibliographic details
Press, Volume CIV, Issue 30761, 27 May 1965, Page 1
Word Count
115GAS MAIN TO PORT Press, Volume CIV, Issue 30761, 27 May 1965, Page 1
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.