League Asks For Better Arthur’s Pass Road
Concern about the condition of toe Arthur’s Pass highway was expressed at toe annual meeting of the Canterbury Progress League last evening. The new president (Mr H H. Deans) said he felt toe road should be improved in time for the opening of the Haast Pass highway. Mr R. C. Neville said the
policy of toe National Roads Board was to complete the paring of the Lewis Pass highway before doing any major work on toe Arthur's Pass route.
About £lO,OOO a year was allocated for certain sections of the Arthur's Pass road but it would be at least three years before any larger amounts were allocated, he said
Something drastic would have to be done, said Mr D W Gray. “It will be a major project, possibly even requiring a tunnel, but I fee) it is time some action was taken." he said. Mr J. Manson Mid it was never really intended that Arthur's Pass should be connected with toe Haast Pass road which was being constructed primarily to provide a round trip of the island. The retiring president (Mr B. J. Drake) agreed.
A motion was carried that toe Commissioner of Works in Christchurch be asked when something would be done about the road.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19630725.2.107
Bibliographic details
Press, Volume CII, Issue 30192, 25 July 1963, Page 12
Word Count
213League Asks For Better Arthur’s Pass Road Press, Volume CII, Issue 30192, 25 July 1963, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.