A NEW BUILDING AT THE CHRISTCHURCH AIRPORT.—A photograph showing the progress of work on the National Airways Corporation’s operations engineering headquarters. The building, which will cost about £67,000, is expected to be occupied early next year.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19611117.2.86
Bibliographic details
Press, Volume C, Issue 29673, 17 November 1961, Page 12
Word Count
36A NEW BUILDING AT THE CHRISTCHURCH AIRPORT.—A photograph showing the progress of work on the National Airways Corporation’s operations engineering headquarters. The building, which will cost about £67,000, is expected to be occupied early next year. Press, Volume C, Issue 29673, 17 November 1961, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.