Thank you for correcting the text in this article. Your corrections improve Papers Past searches for everyone. See the latest corrections.

This article contains searchable text which was automatically generated and may contain errors. Join the community and correct any errors you spot to help us improve Papers Past.

Article image
Article image
Article image
Article image

A FLOATING DOCK is towed down the English Channel on its Way to the Miarchos shipyard in Greece. It was prefabricated in Dusseldorf and assembled in Bremerhaven. The dock has a loading capacity of 26,000 tons and will take vessels up to 50,000 tons deadweight.

Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19590916.2.167

Bibliographic details

Press, Volume XCVIII, Issue 29001, 16 September 1959, Page 17

Word Count
45

A FLOATING DOCK is towed down the English Channel on its Way to the Miarchos shipyard in Greece. It was prefabricated in Dusseldorf and assembled in Bremerhaven. The dock has a loading capacity of 26,000 tons and will take vessels up to 50,000 tons deadweight. Press, Volume XCVIII, Issue 29001, 16 September 1959, Page 17

A FLOATING DOCK is towed down the English Channel on its Way to the Miarchos shipyard in Greece. It was prefabricated in Dusseldorf and assembled in Bremerhaven. The dock has a loading capacity of 26,000 tons and will take vessels up to 50,000 tons deadweight. Press, Volume XCVIII, Issue 29001, 16 September 1959, Page 17

Help

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert