MINING
Placer Development, Ltd.—For three months to November 1, 1942. Pato Consolidated Gold Dredging. Ltd., dredged 4,042,000 cubic yards for a recovery ot 20,019 ounces fine gold and recovered witn its hydraulic units 4018 ounces fine <?o.d, the value of the total production being 804,395 United Stater, dollars. During lie same period Asnazu Gold Dredging, Lin., handled 1,030.300 cubic yards for a recovery of 5501 ounces fine gold, equivalent to 192,535 United States dollars.
Rimu Gold Dredging, Ltd.—A total of 333.6 crude oz of gold was returned for the clean-up period from November 17 to December 1 from 82.723 yards of ial. November totals were 7040z from 170.928 yards in 522 hours.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19421204.2.70
Bibliographic details
Press, Volume LXXVIII, Issue 23812, 4 December 1942, Page 6
Word Count
112MINING Press, Volume LXXVIII, Issue 23812, 4 December 1942, Page 6
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.