MINING NEWS.
TALISMAN DUBBO. i ' NEW MILL OPERATES, i Tlip now mill of the Talisman Dubbo Gold Minps. Limited. situated at thp conflupnce of flip Ohinpmuri and Waitawhpfa rivprs at Karangnhakp. startPd oppratinns on Monday last. It -will operate on low sradp orp for tlip first fpw weeks to "run in" tlip machinpr.v and ••cure" tlip plant. All flip niaPliitiPt-.v is new and or the latest . pnttprn. and designed for pffipipncy and low ! running posts. j Tl\p srold is savpd by thp pvanide process, exhaustive tests madP in England. America and Australia linvinls demonstrated its superiority. and thp various component parts of thp process arp. altlioiieh well tripd out in Amprica and Australia, thp first to hp uspd in New Zealand. Flpptrie power, ohtainpd from flip Thames Vallpy Power Hoard, is used. Thp mill is so designed that it can be run with shifts of two men parh. and in its position controls the various reefs in the company's pronprtiPs on the Karanjahake Mountain. The mill is designed to treat 25 to 30 tons a day, and a large tonnage of ore has been broken ready for treatment.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19380531.2.15.14
Bibliographic details
Auckland Star, Volume LXIX, Issue 126, 31 May 1938, Page 4
Word Count
188MINING NEWS. Auckland Star, Volume LXIX, Issue 126, 31 May 1938, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.