The contractors for reconstructing and sealing the Great South Road between Oliaupo and Te Avamutu are at present concentrating on a stretch of reconstruction two miles south of Ohaupo where several fairly heavy cuttings and fillings are necessary. Near the Te Awamutu Borough boundary a large cul- | vert to replace the bridge over the Mangapiko stream is being constructed. Tlic work is not expected to l»e completed for about or sevn weeks. all t'-pffi" diverted \ia Racecourse Road.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19370701.2.35
Bibliographic details
Auckland Star, Volume LXVIII, Issue 154, 1 July 1937, Page 5
Word Count
78Untitled Auckland Star, Volume LXVIII, Issue 154, 1 July 1937, Page 5
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.