NEW TRAFFIC BRIDGE.
OVER RAILWAY CROSSING.
WORK NEAR ROTORUA
(By Telegraph.—Correspondent.)
ROTORUA, this day.
A commencement will be mad£ ' this week upon the construction of the new concrete overbridge over the level crossing at Koutou, on the outskirts of Rotofua.
The bridge will be 140 feet in length, built in three spans, and will give employment to approximately thirty men for several months.
It is hoped to complete the work during the winter months, in order to avoid a dislocation of holiday traffic. The construction of a road deviation to carry traffic while the bridge is being built will be necessf.rv.
The Public Works Department recently completed the construction of a similar ovetbridge at Tarukenge, ten miles beyond Koutou.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19370429.2.145
Bibliographic details
Auckland Star, Volume LXVIII, Issue 100, 29 April 1937, Page 10
Word Count
119NEW TRAFFIC BRIDGE. Auckland Star, Volume LXVIII, Issue 100, 29 April 1937, Page 10
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.