MINING NEWS
YIELDS OF COMPANIES,
Kins Solomon.—7loz for week. Golden Sands (near Greymourlil.—For 2S shifts of eight hours each, Ulioz tldwt. (Joldtields Dredging (Shotover, Otago).— 7oz 14(lwt for 115 hours during the ten days ended January 23. The dredge has acain been dealing with silt deposited by three recent floods. Stafford Dredging (near Hokitika). —For ten days ended January 10. !)2oz tor Io.'JMJ cubic yards dredged. A quarter of the material was old worked ground.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19350126.2.17
Bibliographic details
Auckland Star, Volume LXVI, Issue 22, 26 January 1935, Page 4
Word Count
75MINING NEWS Auckland Star, Volume LXVI, Issue 22, 26 January 1935, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.