THE LARGEST UNDER-WATER TUNNEL IN THE WORLD. — The Mersey tunnel which has taken eight years to construct, will be officially opened by the King and Queen m July. The tunnel is three mile.> long and has cost about £8,000,000 to build. It is estimated that every year at least two million motor vehicles •jyill pass through it. This picture shows the Birkenhead Junction Chamber.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19340322.2.47
Bibliographic details
Auckland Star, Volume LXV, Issue 69, 22 March 1934, Page 7
Word Count
64THE LARGEST UNDER-WATER TUNNEL IN THE WORLD. — The Mersey tunnel which has taken eight years to construct, will be officially opened by the King and Queen m July. The tunnel is three mile.> long and has cost about £8,000,000 to build. It is estimated that every year at least two million motor vehicles •jyill pass through it. This picture shows the Birkenhead Junction Chamber. Auckland Star, Volume LXV, Issue 69, 22 March 1934, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.