BRITISH NAVY.
Year's Estimates Increased £3,000,000. CONSTRUCTION PROGRAMME. (Received 12.30 p.m.) LONDON, March 6. Tho Navy Estimates for 1034 total £00,550,000 net, compared with £53,570,000 in 1933. The new construction programme includes four cruisers, of which three will be of the new Monotaur type, one of the Arethusa, and one tho Leader class, eight destroyers, one aircraft-carrier, two patrol type of submarines and one minelayer submarine.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19340307.2.77
Bibliographic details
Auckland Star, Volume LXV, Issue 56, 7 March 1934, Page 7
Word Count
66BRITISH NAVY. Auckland Star, Volume LXV, Issue 56, 7 March 1934, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.